Laserfiche WebLink
NANETTEAKYA7_ <br />West of US-1 Drainage Study Area — City of Hallandale Beach, Florida <br />® Roadway Designer — She prepared the exhibits and area calculations for the drainage report. <br />Town Center Roadway Study — City of Coral Springs, Florida <br />Roadway Designer — She prepared layouts of the bus stations and connecting roadways for transit improvements. <br />TRANSPORTATION DESIGN EXPERIENCE <br />Design/Build for the Reconstruction of SE 3b Street, Belle Glade, Florida — FOOT, District 4 <br />Project Designer — She was responsible for the production of roadway plans, signing and pavement marking plans and <br />quantities. The scope of this project included roadway plans, drainage design, signing and marking plans and utility <br />relocation plans. The design included the use of filter fabric and a thick sub -base in lieu of demucking the roadway. Project <br />length: 0.3 miles <br />Northlake Boulevard over the Loxahatchee Slough — Palm Beach County, Florida <br />Roadway Designer — The project consisted of reconstruction of a four lane divided highway, construction of a bridge, weir <br />and walkway. She was responsible for the geometries, signing and pavement markings, weir placement and grading of the <br />channel and walkway, quantity calculations and cost estimates. Project length: 0.349 milestbridge .007 miles. <br />1-75/Griffin Road Interchange, Broward County, Florida — FOOT, District 4 <br />Roadway Designer — The scope consists of improvements including modifications to the interchange by realigning the 1 -75 <br />ramps to converge at a new signalized intersection. Her responsibilities include the geometries, signing and pavement <br />markings, signalization and long range estimates. Project length: 1 mile. <br />US- 11SR -5, St. Lucie County, Florida — FOOT, District 4 <br />Roadway Designer — Responsible for the signalization plans. <br />1.95 HOV, Palm Beach County, Florida — FOOT, District 4 <br />Roadway Designer — Provided quality control review for two separate 1 -95 HOV design contracts. The scope of services <br />included geometric, drainage, signing and marking, traffic control reviews. <br />Powerline Road (SR -845) Palm Beach County, Florida — FOOT, District 4 <br />Roadway Designer — She was responsible for the preparation of roadway quantities, computation book and transport input. <br />The scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including; drainage <br />design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, structural plans <br />(bridge widening), a public involvement program and landscape improvements. Project length: 3 miles. <br />1.95 Pump Station, Pembroke Park, Florida — FOOT, District 4 <br />Roadway Designer — She prepared the roadway plans for reconstruction of 30�11 Avenue. <br />US-1/SR-5, Miami -Dade County Line to Hallandale Beach Boulevard — FOOT, District 4 <br />Roadway Designer — She prepared the typical section package and quality control review. <br />SR-80 Crestwood to 10511 Avenue — FOOT, District 4 <br />Roadway Designer — She prepared the roadway, signing and marking and drainage plans. <br />SR -A1A (from County Road to Flagler Memorial Bridge) Palm Beach County, Florida — FOOT, District 4 <br />Roadway Designer — The project consisted of milling and resurfacing of 0.25 miles of a 44ane divided highway for FDOT, <br />District 4 (2000). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility <br />relocation, as well as, the design and drafting of signing and markings and lighting plans including lighting calculations. She <br />was in charge of the quantities input in the FDOT CES system. <br />Southern Boulevard (SR -80) from Forest Hill Boulevard to SR -7, Palm Beach County, Florida — FOOT, District 4 <br />Roadway Designer — The project consisted of reconstruction of a 3 mile, 6 -lane divided urban highway for FDOT, District 4 <br />(2000). Her responsibilities included drafting of the roadway plans, drainage, traffic control, signalization, utility relocation, <br />signing and marking and lighting plans. <br />SR-68 Orange Avenue (from 131^ Street to Indian River) St. Lucie County, Florida — FOOT, District 4 <br />Roadway Designer — The project consisted of major reconstruction of 1 mile of a 4 -lane undivided highway for the City of <br />Fort Pierce and FDOT, District 4 (1999). Responsible for the drafting of roadway plans, traffic control, signalization, utility <br />relocation, as well as the design and drafting of signing and marking and lighting plans including lighting calculations. <br />SR-615 (from Avenue O to US -1) St. Lucie County, Florida — FDOT, District 4 <br />Roadway Designer — The project consisted of major reconstruction of 2.5 miles of a 6 -lane divided highway for FDOT, <br />District 4. She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, <br />signing and marking and lighting plans. <br />QR.J.Behar <br />RFO No. 14-07-021 Page 1 3.35 <br />