My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MYLENE ALMEIDA, El <br />CIVIL ENGINEERING <br />EDUCATION <br />B.S. Civil Engineering, Florida International University, 2012 <br />YEARS OF EXPERIENCE YEARS WITH RJ BEHAR <br />4 Years 2014 - Present <br />PROFESSIONAL REGISTRATIONS <br />E.I. Florida License Number 1100016835, 2012 <br />EXPERIENCE <br />PROFESSIONAL SOCIETIES <br />Member of ASCE FIU Chapter <br />Ms. Almeida has graduated with a civil engineering degree. She is currently an Engineer Intern exam. At R.J. <br />Behar & Company, Inc., she is currently preparing plans in Microstation and AutoCad. She is proficient in <br />Microsoft Word, Excel, and Publisher. She is very familiar with the AASHTO Bridge Design Specifications, AISC <br />Steel Construction Manual, and FDOT Structures Manual. She also is certified in Maintenance of Traffic <br />RELEVANT EXPERIENCE <br />Design Services for Lehman Causeway Wall- Sunny Isles Beach, Fl- Sunny Isles Beach <br />Project Engineer- She is responsible for the production of roadway plans, signing and pavement marking plans <br />Boulevard Resurfacing from NE 199th Street to NW 213th Street, Miami -Dade County - <br />Reference: Mr. Danny Iglesias, PE, Project Manager; (305) 470 -5289; Email: dannv.iglesiasodot.state.fl.us <br />Role: Project Engineer — She is responsible for the production of roadway plans, signing and pavement marking <br />plans. The scope of work includes milling and resurfacing, pavement widening, median reconstruction, upgrading <br />pedestrian facilities to comply with ADA requirements, signing and pavement markings, bike lane designations, <br />and providing signalization and operational improvements at the intersections. <br />Project Number: 414624- 3 -32 -01 Project Length: 1.2 miles Project Start: 6/2013 Project Complete: <br />Ongoing <br />Company: R.J. Behar & Company, Inc. (2014- Present) <br />SR- 83610olphin Expressway Interchange at NW 87th Avenue (Bridges 1, 5 & 6) — Miami -Dade Expressway <br />Authority <br />Project Engineer — She designed cantilever overhead sign structures, mast arms, drilled shafts and lighting high <br />mast poles using FDOT's structures design programs. She has also assisted with the design of concrete bridge <br />decks using the MathCAD Program, calculations of finish grade elevations using Geopack, and preparing <br />computational books and documented design quantities for bridge projects as per FDOT Basis of Estimates <br />Manual, creation of reinforcing bar lists from scratch, supervised and scheduled the work to CAD technicians. <br />She has also prepared Bridge Calculation Reports. <br />Company: A &P Consulting Transportation Engineers (2012 —2014) <br />City of Miami Capital Improvements Department: RRR Projects - City of Miami <br />Project Engineer /Utility Coordination — She was responsible for drafting roadway plans and signing and pavement <br />markings plans using the CADD system, Microstation, FDOT Site Menu and Geopak software. She also <br />prepared and reviewed typical sections, cross sections, and horizontal and vertical alignment. Her <br />responsibilities included preparing, reviewing, and updating roadway plans and other construction documents in <br />Behar <br />RFQ No. 14-07-021 Page 13.38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.