Laserfiche WebLink
MYLENE PLAZ. El <br />accordance with FDOT Plans Preparation Manual (PPM), FDOT Design standards and other design and <br />construction standards. As utility coordinator, she obtained Sunshine One design tickets, prepared utility contact <br />letters and plans to submit to utility agency owners. She was responsible for creating utility matrices, keeping <br />track of utility work schedules and clearance letters, coordinated utility meetings and followed up on conflicts to <br />prevent/avoid project delays. <br />Company: A &P Consulting Transportation Engineers (2012 —2014) <br />Consultant at Florida Department of Transportation District 6 <br />Ms. Almeida prepared computational books and documented design quantities for projects as per FDOT Basis of <br />Estimates Manual, prepared progress reports to attend design phases meeting to provide updates regarding the <br />status of the project, worked on roadway design projects for FDOT and City of Miami. She prepared and <br />reviewed reports to submit Design Approval Requests (exceptions and variations) as per FDOT Plans <br />Preparation Manual. Ms. Plaz was also a Design Support Engineer, working on the implementation of new state- <br />wide software: Project Suite Enterprise Edition (PSEE), developing Instructional Guidelines for Project Managers <br />on how to use PSEE to request changes in scope of work, scheduling, and project estimate. <br />Company: A &P Consulting Transportation Engineers (2012 —2014) <br />Intern at E Sciences Inc. <br />She performed NPDES inspections and reports and collected historical data for constructions sites. <br />Company: E Sciences, Inc. (10/2010 -12 -2010) <br />Skills <br />® • MathCAD <br />• Microstation, Geopak <br />• ArcGIS <br />• AutoCAD <br />• Highly proficient in Microsoft Excel, Microsoft Power Point, Microsoft Word and Adobe Acrobat. <br />• Fluent in English and Spanish <br />qw It R.).Behar <br />RFQ No. 14 -07 -02 1 Page 13.39 <br />