My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YAJ AIRA L. MOLEIRO, E1 <br />TRAFFIC ENGINEERING <br />EDUCATION <br />M.S. Transportation Engineering - Currently enrolled <br />B.S. Civil Engineering, Villanova University, PA, 1986 <br />YEARS OF EXPERIENCE YEARS WITH RJ BEHAR <br />27 Years 2013 - Present <br />PROFESSIONAL REGISTRATIONS <br />Engineer Intern, Florida License No.1095176, 1995 <br />ENGINEERING EXPERIENCE <br />Ms. Moleiro is a highly skilled professional with vast experience in the area of traffic engineering and design. Her skills <br />include the use and application of the latest traffic data collection, crash analysis, traffic operations and transportation <br />planning tools, techniques and software. She has in -depth knowledge of SYNCHRO, CORSIM, HCS 2010, SIDRA, <br />TRANSYT 7F, TURNS 5 tool, TM -tool, SIGNAL -2000 and PASSER. <br />Ms. Moleiro's experience also includes design, programming, and optimizing various computerized signal systems for the <br />preparation of signal, signing and marking, and traffic control plans, traffic operations and traffic impacts, access and <br />parking studies and macro and micro simulation traffic modeling. She has significant knowledge of the PD &E process and <br />the Interchange Modification or Justification Guidelines. She has developed cost estimates and scope of services for <br />projects in Miami -Dade, Broward and Palm Beach Counties. She has experience working with the Florida Department of <br />Transportation, Pennsylvania Department of Transportation, Federal Highway Administration and Metropolitan Planning <br />Organizations. <br />RELEVANT EXPERIENCE <br />Traffic Operations /Safety Studies — FOOT District 6 <br />Traffic Operations/Safety Engineer — She is responsible for providing services including the development of safety and <br />traffic operations studies. <br />Traffic Engineering — City of Doral, FL <br />Traffic Engineer/Transportation Planner — She is responsible for performing review of traffic calming studies, traffic impact <br />studies and performing traffic operations and safety studies for the City of Doral. <br />1- 95/Donald Ross Road Interchange Design (IOAR) - FOOT District 4 <br />Project Engineering responsible for developing all traffic engineering analyses including the Interchange Operational <br />Analysis Report (IOAR) to conform to State and Federal policies and guidelines. <br />1-10, Project Development and Environment (PD &E) Study — FOOT District 2 <br />Transportation Engineer— Task included operational analysis using HCS and SYNCHRO. <br />Company: The Corradino Group, Inc. <br />Traffic Impact Study — City of Homestead, FL <br />Transportation Engineer — She assisted in the review of reports and technical analysis of the Traffic Impact Study submitted <br />from private entities to the City of Homestead. <br />Company: The Corradino Group, Inc. <br />Coconut Grove Feasibility Study — City of Miami, FL <br />Transportation Engineer — She was responsible for traffic forecasting and testing different alternatives to accommodate new <br />design on a segment of the study area. The operational analysis was performed using SYNCHRO. <br />Company: The Corradino Group, Inc. <br />1 -75, Project Development and Environment (PD &E) Study — FOOT District 4 <br />Senior Transportation Engineer — Task included operational analysis, traffic forecasting, crash analysis and conceptual <br />funding plan. The operational analysis was performed using HCS, CORSIM and SYNCHRO. <br />Company: Reynolds, Smith & Hills, Inc. <br />US 441 - Corridor Feasibility Study — FDOT District 4 <br />Senior Transportation Engineer — Task included traffic forecasting and operational analysis using Generalized FDOT <br />Tables. <br />RFQ No. 14-07-021 Page 13.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.