Laserfiche WebLink
YAJAIRA 1%10LEIR0. E <br />Company: Reynolds, Smith & Hills, Inc. <br />® 1.95 Managed Lanes Study — FDOT District 4 <br />Senior Transportation Engineer — Task included operational analysis and traffic forecasting. The operational analysis was <br />performed using SYNCHRO and CORSIM. <br />Company: Reynolds, Smith & Hills, Inc. <br />1.95, Project Development and Environment (PD &E) Study — FDOT District 4 <br />Senior Transportation Engineer — Task included operational analysis, traffic forecasting, crash analysis and conceptual <br />funding plan. The operational analysis was performed using HCS. <br />Company: Reynolds, Smith & Hills, Inc. <br />1.595, Project Development and Environment (PD &E) Study, Broward County, FL — FDOT District 4 <br />Senior Transportation Engineer — Task included operational analysis, traffic forecasting, crash analysis and conceptual <br />funding plan. The operational analysis was performed using HCS. <br />Company: Reynolds, Smith & Hills, Inc. <br />Districtwide General Planning Consultant// -595 System Interchange Modification Report (SIMR), Broward County, <br />FL <br />Senior Transportation Engineer — Task included operational analysis, and traffic forecasting. <br />Company: Reynolds, Smith & Hills, Inc. <br />1- 9511ndiantown Road Interchange Modification Report (IMR) Palm Beach County, FL <br />Senior Transportation Engineer — Planning study to develop and evaluate design alternatives for modifications of the <br />I- 95 /Indiantown interchange. Task included operational analysis, traffic forecasting, crash analysis and conceptual funding <br />plan. The operational analysis was performed using CORSIM and HCS. <br />Company: Reynolds, Smith & Hills, Inc. <br />Florida Intrastate Highway System (FIHS) Policy and Procedures Statewide <br />Senior Transportation Engineer — She assisted in the review of reports and technical analysis of the IMR's and IJR's <br />submitted from FDOT District offices or private entities. <br />Company: Reynolds, Smith & Hills, Inc. <br />® SR-84 EB Slip Ramp Interchange Operational Analysis Report (IOAR) Broward County, FL <br />Senior Transportation Engineer — She was responsible for documented the IOAR to shows the construction of the new SR- <br />84 EB Slip ramp. She provided for traffic operational analysis for the proposed ramp from eastbound SR-84 to eastbound 1- <br />595 at the 1- 75 /Sawgrass interchanges. The analysis was conducted in accordance with the Florida Department of <br />Transportation and the Federal Highway Administration (FHWA) rules and regulations. <br />Company: Reynolds, Smith & Hills, Inc. <br />I.951Central Boulevard Interchange Justification Report (IJR) Palm Beach County, FL <br />Senior Transportation Engineer — Task included operational anatysis, traffic forecasting, crash analysis and conceptual <br />funding plan. The operational analysis was performed using CORSIM and HCS. <br />Company: Reynolds, Smith & Hills, Inc. <br />Districtwide General Planning Consultant, Broward County, FL <br />Senior Transportation Engineer — She was responsible for the review of applications for Transportation Enhancements <br />funding submitted by the Metropolitan Planning Offices (MPO's) and/or County Commissioner. She was also responsible for <br />recommending eligibility and for coordinating with dients and sub consultants. <br />Company: Reynolds, Smith & Hills, Inc. <br />1.9511.595 Interchange operational Analysis Report (IOAR) Broward County, FL <br />Senior Transportation Engineer — She assisted in the documentation of the Interchange operational Analysis Report (IOAR) <br />for the 1- 95/1 -595. She was responsible for the traffic operational analysis for existing and future conditions. Task included <br />travel demand forecast, crash analysis and identification of the funding programs that will support the proposed <br />improvements. <br />Company: Reynolds, Smith & Hills, Inc. <br />Miami- Dade County Transportation System Hurricane Emergency Preparedness Study <br />Senior Transportation Engineer — Internal Project Manager for the development of a hurricane emergency preparedness <br />plan of the Dade County Transportation System. Information from multiple sources was integrated in a Geographical <br />Information System to perform database development, conduct analysis and produce strongly effective informative <br />presentations. <br />0 Company: Post, Buckley, Schuh & Jernigan, Inc <br />R.J.Behar <br />�nl RFQ No. 14-07-021 Page 13.41 <br />