|
S UG E ILY P ATXOT
<br />B. S. Civil Engineering, University of Puerto Rico, 2007
<br />YEARS OF EXPERIENCE YEARS WITH RJ BEHAR
<br />7 Years 2007 - Present
<br />OFFICE LOCATION: Pembroke Pines, Florida
<br />ENGINEERING EXPERIENCE
<br />Ms. Patxot has seven years of experience working on a wide range of water resource projects. At RJ Behar, Ms. Patxot is
<br />responsible for plans preparation, performing calculations and designing drainage systems. She has worked on the
<br />preparation of drainage projects as well as designing construction plans for sanitary sewers.
<br />RELEVANT EXPERIENCE
<br />SR- 86211.595 Final Design /Build, Broward County, Florida — FDOT District 4, FM #: 406094. 4.52 -01
<br />Project Designer involved with developing the drainage master plan update, and assisting with the drainage design for
<br />several sections of the corridor. Design tasks included exfiltrafion trench design, storm sewer design and analysis, and both
<br />wet and dry retention stormwater management pond designs. The design involved the use of spreadsheets, ICPR, ASAD
<br />and Microstation. She is currently performing CAD designs for the post -design services.
<br />SR-9336/SW 328th Street from SW 152nd Avenue to SW 137th Avenue, City of Homestead, Florida — Miami -Dade
<br />County Public Works Department; Highway Division/Plans Review And Design
<br />Project Designer — She participated in the preliminary drainage design on this project. The scope of the project induced
<br />master planning and feasibility analysis for a new roadway, including evaluation of traffic signals.
<br />SR- 8201Hollywood Boulevard from SR -AIIA to US -1, Broward County, Florida — FOOT District 4, FM #: 41383515201
<br />Project Designer: She assisted with the drainage calculations and report preparation. The project scope consisted of milling
<br />and resurfacing the existing pavement along Hollywood Boulevard in Broward County from just east of Young Circle to just
<br />west of the Intracoastal Waterway (SR -A1A).
<br />SR- 9731NW 87th Avenue, Miami -Dade County, Florida — FDOT District 6, FM #: 405615. 3.52 -01
<br />Project Engineer who prepared the fill and dredge sketches. The scope included new construction and reconstruction of NW
<br />871'Avenue from NW 7411 Street to NW 103rd Street in Medley, Florida.
<br />SR -AIIA Resurfacing Project, Palm Beach County, Florida — FDOT D4, FM #: 40361015201
<br />Ms. Patxot prepared plan revisions during post design services. The scope consisted of roadway improvements along SR-
<br />AtA, from Boynton Inlet Bridge to Lake Worth Road. The project included a major drainage study and improvements, milling
<br />and resurfacing, signals, bridge improvements, signing and marking plans.
<br />Crown Linen Laundry — Hialeah, Florida
<br />Designer — She was responsible for the plans preparation of the water and sewer systems. The scope of services included
<br />data collection, water and sewer design and plans preparation. Ms Pabcot, in addition, was responsible for obtaining water
<br />and sewer permits from Miami -Dade County, Water and Sewer Department (WASD) and the Department of Environmental
<br />Resource Management (DERM).
<br />C-4 Canal Flood Protection Belen Section, Miami -Dade County, Florida — South Florida Water Management District
<br />Designer in charge of plans preparation for designing a floodwall for flood protection within Belen in Miami -Dade County.
<br />North County Neighborhood Improvement Project — Broward County, Florida
<br />Designer in charge of the plans preparation, drainage and quantity calculations. She has also provided services during
<br />construction as a construction office engineer. Her duties include reviewing pay quantities, and miscellaneous inspections.
<br />Broadview Estates BP 2 Sanitary Sewer Collection — Broward County Water and Wastewater Department
<br />Designer in charge of preparing plans and profiles for a sanitary gravity collection system for a complete neighborhood.
<br />Structure Inspection Program (SIP) Non -Sta Structures — South Florida Water Management District (SFWMD)
<br />Designer who coordinated the preparation of deliverables with the inspectors. She followed up with QC comments as well
<br />as dient comments. She planned and prepared tracking charts for all deliverables. She worked on the preparation of all the
<br />inspection reports in coordination with the inspection team.
<br />SW 1761, Street from SW 107th Avenue to US -1, Miami -Dade County, Florida — Miami -Dade County Public Works
<br />Designer for plans preparation. The scope of this project included master planning, feasibility analysis, and design. After
<br />the master planning was completed then the roadway design, drainage design, signing and marking designs proceeded.
<br />23.
<br />J.Behar
<br />RFQ No. 14 -07 -02 1 Page 13.45
<br />
|