My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARIANA URDANETA <br />SW 326th Street from SW 152^^ Avenue to SW 1371h Avenue — Miami -Dade County Public Works <br />Technician — She prepared the roadway plans. The scope of the project included, master planning and feasibility analysis <br />for the new roadway. The project involved, upgrading the existing traffic signals to mast -anus, and internally illuminated <br />signs. The design phase for the project comprised of drainage, lighting, signalization, signing and pavement markings. <br />Hialeah Parking Garage - Civil Plans — City of Hialeah, Florida <br />Technician — She prepared civil plans in regards to water and sewer drainage for the parking garage. <br />West 29th Street Improvements — City of Hialeah, Florida - LAPIARRA Project <br />Technician — Responsible for the preparation of a spreadsheet for the summary of the proposed work on W. 29th Street <br />improvements. The scope of this project consisted of sidewalk, curb and gutter replacement and patching, driveway <br />replacement and patching, manhole and inlet cleaning, inlets and valve box adjustments, replacement of inlet tops, <br />removal and installation of single post signs. This project was part of the American Recovery and Reinvestment Act, which <br />was supported by federal funds. The project consisted of extensive field work in order to locate roadway deficiencies. ADA <br />improvements, curb, driveway and sidewalk repairs, utility locations and roadway repairs were some of the aspects <br />documented for this project. This was a FDOT Local Agency Program (LAP) project. <br />E. tm Avenue, E. 4Th Street, E. 481h Street - Reconstruction — City of Hialeah, Florida <br />Technician — She designed plans for the reconstruction of the roadway, drainage, signing and pavement markings. <br />Palm Avenue (W. 4Th Street to W. 49th Street) — City of Hialeah, Florida <br />Technician — Responsible for the preparation of the spreadsheet for the summary of the proposed work on Palm Avenue <br />(W. 47" Street to W. 49M Street) within the City of Hialeah. <br />Structure Inspection Program (SIP) Non -Sta Structures — South Florida Water Management District (SFWMD) <br />Technician — She prepared the drainage structure sketch plans and location photo map plan sheets. <br />SE 15th Street, South Miami Road, SE 10th Avenue - Intersection Improvements — City of Fort Lauderdale, Florida <br />Technician — She was responsible for preparing the design analysis plans. <br />SR-7/Sunrise Boulevard Lighting Design — City of Lauderhill, Florida <br />Technician — She prepared the lighting plans for the SR-7/Sunrise Boulevard project. <br />Sunrise Lakes Boulevard Intersection Improvements — City of Sunrise, Florida <br />® Technician — She designed and prepared the roadway, signing and pavement marking plans. <br />Southwest Ranches Multi -Use Trails — Town of Southwest Ranches, Florida <br />Technician — Responsible for the preparation of the multi -use trail plans. <br />51h Street Fire Station Mezzanine Addition — City of Hialeah, Florida <br />Technician — Prepared the structural plans for the 51h Street Fire Station. <br />East 411 Avenue Street Assessment — City of Hialeah, Florida <br />Technician — Prepared the graphic reports and sketches. <br />Griffin Road Landscaping — Town of Southwest Ranches, Florida <br />Technician — Responsible for preparing the landscape and irrigation plans for Griffin Road. <br />Old Davie School Improvements — Town of Davie, Florida <br />CADD Technician — The scope of this project consisted of drainage, parking and utility improvements for an historical <br />school (now converted to a museum) and adjacent park property. <br />Countess De Hoemle Park — City of Boca Raton, Florida <br />Technician — She drafted plans for the structural elements. The buildings included two main restroom- vending buildings, <br />dugouts, entry signs, poles and foundations of drawings for tot lots and bleachers. <br />Crandon Marina Improvements — Miami -Dade County Park and Recreational <br />Technician — Responsible for preparing the structural plans for the Crandon Marina improvements. <br />Fleet Maintenance Facility — Miami -Dade County, Florida <br />Project Engineer responsible for the site plans. The scope of this project included drainage design, permitting and utility <br />coordination. <br />Miramar Town Center Headwalls — Rock -Kim Miramar, Florida <br />Technician — She prepared all the structural drawings. <br />C 4 Canal Flood Protections - Phase III & IV (Belen) — South Florida Water Management District (SFWMD) <br />Technician — Responsible for all of the structural drawings. <br />Design of Pavement Repairs for Royal Palm Boulevard — City of Coral Springs, Florida <br />® Technician — She prepared the plans for repairs to Royal Palm Boulevard, <br />MR.).Behar <br />RFQ No. 14 -07 -02 1 Page 13.47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.