RAFAEL URDANETA, CCM
<br />Reference: Mr. David L. Young, PE, (561) 684 -4149, PB Co.; Mr. Rick Peterson (561) 370 -1130, LAP Coordinator/PA
<br />® FDOT
<br />Project Administrator — He is responsible for overseeing and monitoring all aspects of the project. He supervises the field
<br />inspection team; provides guidance and resolution on field changes that take place, as well as observing the schedule and
<br />budget. The structural components of this project included a new combined traffictrail signal system for the CSX/Tri-Rail
<br />Gate Crossing, new overhead truss cantilever sign structure drilled shaft foundations, five (5) signalization mast arm drilled
<br />shaft foundations, and Class II Structural Concrete for protection of existing piers underneath the overpass. He managed
<br />the CEI contract, supervised the field inspection; reviewed and approved the drilled shaft installation plan, including the
<br />review of the drilled shaft logs; ensured CSL Testing was performed as per the FDOT Specifications; document all
<br />comparison testing between the QC and VT laboratories; provided guidance and resolution on field changes that took place,
<br />coordinated with the Engineer of Record, responded to all contractor's RFIs and shop drawing submittals, was responsible
<br />for confirming and verifying approval of all the materials incorporated into the project, including all the structural steel, LIMS,
<br />and final submittal of the PA Material Statement. Cost/Fees Paid: $209,517.64 Construction Cost: $2,216,015.80
<br />Contractor: Ranger Construction
<br />Company: R.J. Behar FM #: 229755- 2 -58 -01 Project Started: 6/2412011 Project Completed: 6130/2012 Project length:
<br />0.3 miles
<br />Pines Boulevard (SR -820) and 1.75 (SR -93) Bridge Deck Repair, Local Agency Program (LAP) Project, Pembroke
<br />Pines, Fl — City of Pembroke Pines
<br />Reference: Mr. John Danielson, PE, FDOT, District 4
<br />Project Administrator /Contract Support Specialist/Senior Bridge Inspector — He is responsible for overseeing and monitoring
<br />all aspects of the project. He handled all the documentation for this project. He supervises the field inspection team;
<br />provides guidance and resolution on field changes that take place, as well as observing the schedule and budget. The
<br />project included demolition and reconstruction of the concrete bridge deck to a depth of 3.5% sandblasting, check for steel
<br />deterioration, and re- install/splice new reinforcing steel as necessary; and final placement, casting, and curing of the new
<br />concrete overlay deck. Extensive coordination and MOT set -up was required on the 1.75 interstate during the Pines Blvd.
<br />bridge deck demolition operations. Two lanes of traffic were closed at a time beginning from the outside shoulder and
<br />® working towards the median as the sequence of work on the deck above progressed.
<br />Company: R.J. Behar FM #: 414152- 2 -58 -01 Project Started: 5117/2011 Project Completed: 7/3112012 Project
<br />Length: 0.2 Miles
<br />Pines Boulevard (SR -820) and 1.75 (SR -93) Interchange, Local Agency Program (LAP) project, Pembroke Pines, FI —
<br />City of Pembroke Pines
<br />Reference: Mr. Joe McLaughlin, PE (954) 435 -6511 — City Engineer
<br />Project Administrator — He was responsible for overseeing and monitoring all aspects of the project. He supervised the
<br />field inspection team; provides guidance and resolution on field changes that took place, as well as observed the schedule
<br />and budget. The project included modifying the existing interstate overpass, entrance and exit ramps from a rural
<br />configuration to an urban configuration, as well as widening, signalization, landscaping, and access management
<br />improvements. A'Noexcuse Bonus' (250K) with an 'Incentive- Dentive' contracting method was utilized.
<br />Company: R.J. Behar FM #: 41415225801 Project Started: 1012012008 Project Completed: 4130/2011 Project
<br />Length: 1.26 Miles
<br />W. 36"' Avenue from West 76n' Street to West 84"' Street, American Recovery & Reinvestment Act (ARRA) Hialeah,
<br />FI — City of Hialeah
<br />Reference: Mr. Jose Sanchez (305) 687 -2611 — Streets EngineerlMr. Jorge Gomes, PE (305) 470 -5163 — FOOT District 6
<br />Project Administrator — He was responsible for overseeing the reconstruction and final closeout package. The scope for
<br />this project included new sidewalk, curb and gutter, drainage improvements - new drainage inlets, 18' storm sewer cross
<br />drainage pipe, 1,271 LF of 18' exfiltration trench (French drain). The project scope also included pavement milling and
<br />resurfacing, signing and pavement markings, street lighting, tree removal, and grading of the adjacent swale areas and sod
<br />restoration with Performance Turf. Cost/Fees Paid: $126,263.09 Construction Cost: $559,334.45 Contractor: Horizon
<br />Contractors, Inc.
<br />Company: R.J. Behar FM #: 427604- 1 -58 -01 Project Started: 6/16/2010 Project Completed: 8/31/2011 Project length:
<br />0.5 miles
<br />u
<br />1% R.).Behar
<br />RFQ No. 14 -07 -021 Page 13.50