MAURICIO PINZON
<br />FM #:42760435801 Project Started: 1111/2012 Project Completed: 1/1512013 Project Length: 0.48
<br />® Miles
<br />W. 53b Street from W.1P Avenue to W. 1P Avenue, —City Of Hialeah, Florida; FDOT ARRA
<br />Reference: Mr. Jose Sanchez (305) 687 -2611 — Streets EngineerlMr. Jorge Gomes, PE (305) 470 -5183 — FDOT, District
<br />6
<br />Contract Support Specialist/Inspector - He scheduled field meetings and attended progress meetings; managed utility
<br />coordination; reviewed RFI's and requests for clarification; prepared daily inspection reports; reviewed and analyzed
<br />change orders and pay requests; and project doseout. The scope included new sidewalk, curb and gutter, new drainage
<br />inlets, 18' storm sewer cross drainage pipe, 18' exfiltration trench, pavement milling and resurfacing, signing, pavement
<br />markings and grading of the adjacent swale areas and sod restoration.
<br />FM #: 427604 -1 -58-01 Project Started: 8117/2010 Project Completed: 6/30/2012 Project length: 0.5 miles
<br />Resurfacing of SW 1P Street (SR -869) from Powerline Road to Newport Centre Drive, Hybrid Project — Florida
<br />Department of Transportation, District 4
<br />Reference: Project Manager- FDOT D4- Javier Bejarano, PE (954) 677 -7055; Project Administrator: Arturo Castro (954)
<br />677 -7055 Senior Inspector — He was responsible for managing utility coordination; reviewing RFI's and requests for
<br />clarification; verifying materials; preparing daily inspection reports; monitoring compliance with MOT plans;
<br />reviewinglanayzing change ordersipay requests; monitoring the construction activities/procedures. The scope consisted of
<br />milling, resurfacing, adding a shoulder and sidewalks on the north side of the roadway. ADA upgrades at crosswalks,
<br />signalizaton improvements, minor drainage improvements, and guardrail enhancements over the existing bridge structure.
<br />Company: R.J. Behar FM #: 4246651.52 -01 Project Started: 211412012 Project Completed: 3/22/2013 Project
<br />Length: 1.829 Miles
<br />Atlantic Boulevard at Rock Island Road Intersection Improvements, Broward County, FI — Broward County
<br />Highway Construction and Engineering
<br />Reference: Mr. Richard Tomese, PE, Director of Broward County Engineering, (954) 577 -0579
<br />Inspector - He assisted the senior inspector with managing utility coordination; reviewing RFI's and requests for
<br />clarification; checking shop drawings for conformity to plans; preparing daily inspection reports; monitoring compliance with
<br />MOT plans; monitoring the construction activities and procedures. The project included drainage, sidewalks, curb and
<br />gutter, signalization, signals, roadway widening, milling and resurfacing, signing and pavement markings, landscaping, and
<br />irrigation improvements. Project length: 0.5 miles
<br />Company: R.J. Behar County #: 78421 Project Started: 11712011 Project Completed: 212812012 Project Length: 0.5
<br />Miles
<br />Hillsboro Boulevard at Military Trail Intersection Improvements, Broward County, FI — Broward County Highway
<br />Construction and Engineering
<br />Reference: Mr. Richard Tomese, PE, Director of Broward County Engineering, (954) 5774579
<br />Senior Inspector — He assisted the senior inspector with managing utility coordination; reviewing RFI's and requests for
<br />clarification; checking shop drawings for conformity to plans; preparing daily inspection reports; monitoring compliance with
<br />MOT plans; monitoring the construction activities and procedures. The project included drainage, sidewalks, curb and
<br />gutter, signalization, signals, roadway widening, milling/resurfacing, and signing and pavement markings, landscaping, and
<br />irrigation improvements. Project length: 0.8 miles.
<br />Company: R.J. Behar County #: 78422 Project Started: 117/2011 Project Completed: 2/28/2012 Project length: 0.8
<br />miles North County Neighborhood Improvements Project, Phase II, Broward County, Fl— Broward County Water
<br />and Wastewater Department
<br />Reference: Mr. Jose McCray, Project Manager (954) 628 -3634
<br />Senior Inspector — Responsibilities entailed providing construction inspection of the drainage improvements which
<br />consisted of new exfiltration systems, the addition of drainage catch basins, and control structures with weirs and a
<br />connection to existing outfalls. Other tasks were quantity vedfication, preparation of monthly and final estimates
<br />documentation, projections of costs and quantifies, preparation of contract work orders/change orders and supplemental
<br />agreements. He also reviewed invoices, and tracked material certification documents Costl Fees Paid: $881,266.00;
<br />Construction Cost: $88,000,000 (Est.)
<br />Company: R.J. Behar FM #: NIA Project Started: 31512007 Project Length: N/A
<br />11
<br />IMR.J.Behar
<br />RFQ No. 14-07-021 Page 13.54
<br />
|