Laserfiche WebLink
MAURICIO PINZON <br />CONSTRUCTION ENGINEERING INSPECTIONS <br />EDUCATION <br />B.S. in Civil Engineering, Colombia, 2000 <br />YEARS OF EXPERIENCE <br />8 Years <br />AVAILABILITY <br />CERTIFICATIONS: <br />• Asphalt Paving Technician Level I & II <br />• Earthwork Construction Inspection Level I & II <br />• Concrete Field Technician Level I & II <br />• Final Estimates Level I & II <br />• Pile Driving <br />• Drilled Shaft <br />YEARS WITH RJ BEHAR <br />2008 - Present <br />TIN #: P525545752040 <br />• IMSA Traffic Signal Technician Level I <br />• TROXLER Nuclear Gauge Safety/Hazmat Training <br />• APNGA Annual Refresher Portable Nuclear Gauge <br />• FDOT Signalization Construction Training/Slap Team <br />• Stormwater Management <br />• CSX Roadway Worker Protection <br />ENGINEERING EXPERIENCE <br />Mr. Pinzon has over eight years of experience in roadway design and construction engineering inspection projects. His <br />experience includes inspection of structural fabrication, concrete, drainage structure installation, earthwork, asphalt paving, <br />lighting, signalization, ensuring contractors compliance with MOT, and is proficient with FDOT and SFWMD reporting and <br />documentation procedures. Mr. Pinzon also worked as a CEI and Construction Engineer on several projects for the <br />National Highway Institute and Urban Development Institute in Bogota, Colombia. <br />RELEVANT EXPERIENCE <br />Federal Highway (US -1) Beautification, Local Agency Program (LAP) Project, Delray Beach, FL — City of Delray <br />Beach <br />Reference: Tim Tack, PE, Project Engineer, ESD /CRA; 561- 243 -7315 <br />Senior Inspector /Contract Support Specialist — His tasks as Sr. Inspector include preparing daily inspection reports, <br />ensuring the contractor is following the maintenance of traffic plans, attend all progress meetings, inspect all construction <br />performed on this project which includes widening for a street parking area, the addition of a 4 -foot bike lane, new turn left <br />turn lane, new sidewalks, curb and gutter, decorative lighting, milling and resurfacing, including some overbuild areas, <br />pavement markings, drainage modifications, construction of bulb-outs in the radius returns of the side streets, sidewalks, <br />new traffic signal loops at all intersections, new underground traffic signal interconnect system, irrigation, and landscaping. <br />As a CSS he is responsible for the progress and final estimates, processing contract changes, EEO compliance, and <br />finalizing all paper work for the project. <br />FM #: 4204121581 & 4204122581 Project Started: 212512013 Project Completed: on -going Project Length: 2.4 Miles <br />Origin Destination Surveys for Local Bus Routes — Miami -Dade County Metropolitan Planning Organization <br />(Subconsultant to Kimley -Horn & Associates, Inc.) <br />Data Collection — He performed on -board transit surveys along 22 Miami -Dade Transit bus routes for a transit <br />ridership study. <br />FM #: N/A Project Started: 312912013 Project Complete: 6130/2013 Project Length: N/A <br />W. 16th Avenue from W. 7P Street to W. 840, Street, CEI Services — City of Hialeah, Florida — FOOT LAP, FDOT <br />District 6 <br />Reference: Mr. Jose Sanchez (305) 687 -2611 — Streets Engineer <br />Senior Inspector /Contract Support Specialist — As Sr. Inspector he checked consistency of shop drawings to plans; verified <br />materials; monitored the construction activities, prepared daily inspection reports; monitored compliance with MOT plans, <br />managed utility coordination. He inspected the complete reconstruction, curb and gutter, drainage improvements, <br />pavement milling and resurfacing, signing and pavement markings and grading of the adjacent Swale areas and sod <br />restoration. Being the contract support specialist entailed reviewing change orders and pay requests, performing document <br />control, processing contract changes as well as acting as a liaison between the Contractor, FOOT District six personnel <br />and the City. <br />WR.j.Behar <br />RFQ No. 14-07-021 Page 13.53 <br />