|
MAURICIO PINZON
<br />CONSTRUCTION ENGINEERING INSPECTIONS
<br />EDUCATION
<br />B.S. in Civil Engineering, Colombia, 2000
<br />YEARS OF EXPERIENCE
<br />8 Years
<br />AVAILABILITY
<br />CERTIFICATIONS:
<br />• Asphalt Paving Technician Level I & II
<br />• Earthwork Construction Inspection Level I & II
<br />• Concrete Field Technician Level I & II
<br />• Final Estimates Level I & II
<br />• Pile Driving
<br />• Drilled Shaft
<br />YEARS WITH RJ BEHAR
<br />2008 - Present
<br />TIN #: P525545752040
<br />• IMSA Traffic Signal Technician Level I
<br />• TROXLER Nuclear Gauge Safety/Hazmat Training
<br />• APNGA Annual Refresher Portable Nuclear Gauge
<br />• FDOT Signalization Construction Training/Slap Team
<br />• Stormwater Management
<br />• CSX Roadway Worker Protection
<br />ENGINEERING EXPERIENCE
<br />Mr. Pinzon has over eight years of experience in roadway design and construction engineering inspection projects. His
<br />experience includes inspection of structural fabrication, concrete, drainage structure installation, earthwork, asphalt paving,
<br />lighting, signalization, ensuring contractors compliance with MOT, and is proficient with FDOT and SFWMD reporting and
<br />documentation procedures. Mr. Pinzon also worked as a CEI and Construction Engineer on several projects for the
<br />National Highway Institute and Urban Development Institute in Bogota, Colombia.
<br />RELEVANT EXPERIENCE
<br />Federal Highway (US -1) Beautification, Local Agency Program (LAP) Project, Delray Beach, FL — City of Delray
<br />Beach
<br />Reference: Tim Tack, PE, Project Engineer, ESD /CRA; 561- 243 -7315
<br />Senior Inspector /Contract Support Specialist — His tasks as Sr. Inspector include preparing daily inspection reports,
<br />ensuring the contractor is following the maintenance of traffic plans, attend all progress meetings, inspect all construction
<br />performed on this project which includes widening for a street parking area, the addition of a 4 -foot bike lane, new turn left
<br />turn lane, new sidewalks, curb and gutter, decorative lighting, milling and resurfacing, including some overbuild areas,
<br />pavement markings, drainage modifications, construction of bulb-outs in the radius returns of the side streets, sidewalks,
<br />new traffic signal loops at all intersections, new underground traffic signal interconnect system, irrigation, and landscaping.
<br />As a CSS he is responsible for the progress and final estimates, processing contract changes, EEO compliance, and
<br />finalizing all paper work for the project.
<br />FM #: 4204121581 & 4204122581 Project Started: 212512013 Project Completed: on -going Project Length: 2.4 Miles
<br />Origin Destination Surveys for Local Bus Routes — Miami -Dade County Metropolitan Planning Organization
<br />(Subconsultant to Kimley -Horn & Associates, Inc.)
<br />Data Collection — He performed on -board transit surveys along 22 Miami -Dade Transit bus routes for a transit
<br />ridership study.
<br />FM #: N/A Project Started: 312912013 Project Complete: 6130/2013 Project Length: N/A
<br />W. 16th Avenue from W. 7P Street to W. 840, Street, CEI Services — City of Hialeah, Florida — FOOT LAP, FDOT
<br />District 6
<br />Reference: Mr. Jose Sanchez (305) 687 -2611 — Streets Engineer
<br />Senior Inspector /Contract Support Specialist — As Sr. Inspector he checked consistency of shop drawings to plans; verified
<br />materials; monitored the construction activities, prepared daily inspection reports; monitored compliance with MOT plans,
<br />managed utility coordination. He inspected the complete reconstruction, curb and gutter, drainage improvements,
<br />pavement milling and resurfacing, signing and pavement markings and grading of the adjacent Swale areas and sod
<br />restoration. Being the contract support specialist entailed reviewing change orders and pay requests, performing document
<br />control, processing contract changes as well as acting as a liaison between the Contractor, FOOT District six personnel
<br />and the City.
<br />WR.j.Behar
<br />RFQ No. 14-07-021 Page 13.53
<br />
|