|
DALTON POLANCO, El
<br />Company: R J Behar FM# 431281- 4 -52 -01 Project Started: 6/13/2012 Project Completed: 5/13/13 Project Length:
<br />® 308 Feet
<br />Federal Highway (US-1) Beautification, Local Agency Program (LAP) Project, Delray Beach, FL — City of Delray
<br />Beach
<br />Reference: Tim Tack, PE, Project Engineer, ESDICRA City of Delray Beach; (561)- 243 -7315
<br />Senior Inspector — He temporarily substituted on this project. His was responsible for overseeing all construction
<br />performed while on this project, completing interviews, and ensuring that the complete reconstruction, including widening
<br />for a street parking area, the addition of a 4 -foot bike lane, new turn left turn lane, new sidewalks, curb and gutter,
<br />decorative lighting, sod placement; and water main upgrades are constructed per the plans and speculations were in
<br />compliance with FOOT design standards. His duties also included preparing daily inspection reports; monitoring
<br />compliance with MOT plans, and attending progress meetings. The FOOT District four oversees all work being performed
<br />on this project.
<br />FM #: 420412 -1 -58-1 & 420412- 2 -58 -01 Project Started: 2125/2013 Project Completed: 2015 Project Length: 308 Ft
<br />SE 151h Ave. Bridge Replacement, Local Agency Program (LAP) Project, Ft. Lauderdale, FL — City of Ft. Lauderdale
<br />Reference: Ms. Barbara Howell, Project Manager, (954) 828-0505;
<br />Senior Inspector - The scope included full bridge demolition and replacement of existing concrete, 21 double tee beams
<br />with new pre - stressed precast solid panels and an improved pre- stressed precast concrete pile foundation system,
<br />including Class 5 concrete finishing. The project also included sidewalk widening, a traffic railing barrier with aluminum
<br />pedestrian/bicycle railings on both sides, bridge deck grooving, milling and resurfacing, pavement marking and signing,
<br />slope stabilization, utility relocations, lighting, and landscaping modifications. The project included the installation of 112
<br />linear feet of seawall under the new bridge. He performed the field inspection, recorded the pile driving log records,
<br />verified and monitored the vibration levels around all existing adjacent structures, reviewed pile as -built installation plan,
<br />reviewed and analyzed engineer analysis reports for out of tolerance piles, and was responsible or confirming and
<br />verifying approval of all the materials incorporated into the project. Cost/Fees Paid: $534,190.00 Construction Cost: $
<br />3,814,743.00
<br />Company: R J Behar FM #: 230734 - 1.58 -01 Project Stared: 9/5/2012 Project Completed: 10/3012013 Project Length:
<br />®
<br />0.2 Miles
<br />Ocean Avenue Bascule Bridge Over Intracoastal In Lantana, Palm Beach County, Florida
<br />Reference: Francois Thomas, PE, (561) 687 -8536
<br />Senior Bridge Inspector - He performed inspections for the pile driving operation performed by the contractor. He
<br />inspected the pile driving installation which consisted of verification of driving criteria for the test piles being driven as part
<br />of the test pile installation plan, including pile location, design criteria, soil boring data, installation operation, collecting pile
<br />driving data with saximeter in close coordination with the Geotechnical Engineering Company, PDA analysis data
<br />collection and pile driving evaluation, hammer energy determination, accessories verification and documentation, pile
<br />condition and measurements, equipment and template location including survey monitoring, and documentation.
<br />Cost/Fees Paid: $ 30,750.00 Construction Cost: 30 Million. Contractor: GLF Construction Company
<br />Company: R J Behar FM #: 2003502- 1 -58 -01 Project Started: 4110/2012 Project Completed: 9/30/2012
<br />Hillsboro Boulevard at Military Trail Intersection Improvements, Broward County, FI — Broward County Highway
<br />Construction and Engineering
<br />Reference: Mr. Richard Tomese, PE, (954) 577.4579
<br />Senior Roadway Inspector — He verified materials incorporated into the work, verified sampling and testing, prepared daily
<br />inspection reports, reviewed shop drawings, and monitored the compliance with MOT plans as well as monitored
<br />schedules and dates. He also served as liaison between the contractor and county.
<br />Company: R J Behar County #: 78422 Project Started: 17712011 Project Completed: 2/28/2013 Project Length: 0.8
<br />Miles
<br />Atlantic Boulevard at Rock Island Road Intersection Improvements, Broward County, Fl — Broward County
<br />Highway Construction and Engineering
<br />Reference: Mr. Richard Tomese, PE, (954) 577 -0579
<br />Senior Inspector — The project consisted of the construction of a WB left turn lane, WB right turn lane, and dual left -tum
<br />lanes on all four legs of the intersection. In addition, the project included drainage, sidewalks, curb and gutter,
<br />signalization, signals, roadway widening, milling/resurfacing, and signing and pavement markings, landscaping, and
<br />irrigation improvements. Project length: 0.5 miles.
<br />Company: R J Behar County #: 78421 Project Started: 17712011 Project Completed: 2/28/2012 Project Length:
<br />0.5 Miles
<br />WR.J.Behar
<br />RFQ No. 14-07-021 Page 13.52
<br />
|