Laserfiche WebLink
Paul Passe, P.E., CPM <br />Chief Engineer <br />Involved in the preparation of numerous Geotechnical Data Reports which compiled the results of the <br />field and laboratory tests associated with the geotechnical works on land and in water. The field work <br />involved extensive permitting and coordination with various government and environmental entities. <br />The field work involved the use of methodologies such as SPT, rock coring, permeability testing, CPT, <br />Seismic -CPT etc. Due to time restrictions from cruise operations, field work sometimes required <br />working on 24 hour operation. <br />Role: Project Engineer <br />Dates: August 2003 to on -going <br />Client: Mr. Steve Dusseault, P.E., P.G., PB America, 305 -514 -3122 <br />I -95 (SR 9) Roadway Widening in Indian River County. Florida (10 miles) <br />The project involved performing geotechnical work for roadway widening, bridge widening, ponds and <br />studies relating to noise wall. <br />Role: Project Engineer <br />Dates: September 2008 to March 2009 <br />Client: Mr. Terrence Walters, FDOT DMO, 954- 677 -7019 <br />I -10 over Escambia Bay in Pensacola, Florida <br />Part of the CEI team for FDOT District 3; Responsibilities included review of geotechnical <br />data/recommendations and verification testing of piling for bridge replacements. <br />Role: Chief Geotechnical Engineer <br />Dates: 06/05 — 10/08 <br />® Client: Bryan Estock, PE, Ph: (850) 777 -8761 <br />Design - Build: I -95 Roadway Widening in Brevard County, Florida <br />Subsurface investigation, laboratory- testing program pile, foundation design, engineering analysis, <br />report preparation and analysis of PDA test data and issuance of pile certification documents. Project <br />included a bridge widening over Eau Gallie Blvd. and Lake Washington Road, bridge over US -17/92 <br />(SR 500), Pineda Causeway Interchange Over 1 -95 and Wickham Road Bridge. <br />Role: Chief Geotechnical Engineer <br />Dates: 02/08 — 03/09 <br />Client: Sean Moore, PE, Ph: (8 13) 977 -3434 <br />SR -8A (I- 110) /SR -8 (I -10) East of Old Palofax Road to East of SR -291 - Escambia County, Florida <br />Responsible for the subsurface investigation, laboratory- testing program pile, foundation design, <br />engineering analysis, report preparation and analysis of PDA test data and issuance of pile certification <br />documents. <br />Role: Chief Geotechnical Engineer <br />Dates: 05/03 — 10/08 <br />Client: Fred Brown, PE, Ph: (850) 477 -7485 <br />Nei <br />RFQ No. 14 -07 -021 Page 13.68 <br />