My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V 1 Continuing Professional Services for Architectural, Landscape Architectural, <br />Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 <br />®Our team has the ability to respond to numerous projects quickly and we have extensive experience in civil and <br />environmental projects. RJ Behar has performed services similar to the ones requested in this solicitation for <br />several of our clients. Responsiveness is the key to the success of these contracts. We have performed and are <br />currently performing multi -task contracts for many of our clients. We are capable of accomplishing the work in the <br />required time and have the capacity to start any assignment immediately after notice to proceed. <br />We just recently completed hydrologic and hydraulic analyses and plans for the 1 -595 Improvement project. The <br />project is a 1.2 billion dollar Public- Private - Partnership. The project was divided in ten segments. The design for <br />each segment would normally be scheduled over a 3 year design period. We completed 95% of the work in a <br />span of nine months, mostly working concurrently and had to coordinate design tasks with five major roadway <br />designers located in offices in five different states and more than ten offices, and many other specialty <br />consultants. At this time we are only working on post design services. All of our subconsultant team members <br />will be available to augment our capabilities in order to meet schedules and match expertise to the work order <br />requirements. <br />Our objective is to provide the City of Sunny Isles Beach with high quality, timely professional services in support <br />of its work program. RJ Behar is committed to be an extension of your staff and to °tailor fit" our services to <br />provide specifically what the City desires. Our project manager will provide direction and be responsible to the <br />City for the quality and timeliness of the work, whether it is provided by RJ Behar or by our specialty <br />subconsultants. <br />The RJ Behar Team pledges to be responsive and flexible in meeting the City's requirements and schedules, as <br />well as committing all of our resources to achieve this goal. We have assembled a comprehensive team of <br />® experts who will be available to provide any service, from planning and design to construction inspection. All of <br />the team members have expressed their commitment to this contract. <br />0 <br />WORKLOAD DISTRIBUTION <br />The following chart identifies the available staff capacity of our firm, and the projection of current commitments <br />over the next one year period. The graph shows that we will be finishing our larger commitments within the next <br />two to three months and will have available capacity for new assignments. <br />BACKLOG ANALYSIS <br />5.5 <br />5 AVAILABLE STAFF <br />^y a.s 4,715 HOURS <br />S 4 <br />3.5 <br />CD <br />O 3 <br />2.5 <br />V 2 <br />`0a 1.5 <br />m <br />U 1 <br />0.5 <br />0 <br />tl 2 3 4 5 7 8 9 10 11 12 <br />August2014 2015 <br />Months <br />4 R.J.Behar RFQ No. 14 -07 -02 1 Page 14. 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.