My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuing Professional Services for Architectural, Landscape Architectural, <br />Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 <br />®OVERALL ORGANIZATION <br />Our overall organization to complete projects in this contract is shown in our Organization Chart included in <br />Section 3 of this proposal. The chart includes the personnel available and planned for this contract. It is <br />summarized as follows (years of experience in parenthesis): <br />Mr. Javier Rodriguez, PE (25) will be the project manager in charge of delivering and completion of tasks. He <br />will be the main contact with the City as well as the lead engineer for Civil /Recreational Facilities. <br />Mr. Robert Behar, PE (35) will be the Principal -In- Charge and will be an asset to this contract in terms of his <br />overall experience and relations with agencies such as the FDOT. He is currently the president of the Florida <br />Institute of Consulting Engineers. <br />Mr. Juan Vazquez, PE, PH, BCEE (26) will be the lead engineer for stormwater and drainage, as well as water <br />and sewer projects. <br />Mr. David Romano, PE (16) will lead construction administration services and assist with cost estimating. <br />Mr. Jerry Piccolo, PE (33) will assist with any miscellaneous structural designs such as outfalls, seawall repairs, <br />bridge design and evaluations. <br />Mr. Carlos Mazorra, PE (25) will be in charge of the roadway design. He is a former FDOT D6 employee and is <br />current in all aspects of roadway, lighting, signing /markings, ADA, and traffic operations design. <br />Mr. Eduardo M Suarez (28) is the President of Longitude Surveyors, LLC and will be in charge of all surveying <br />®and mapping needed on any project. Mr. Suarez has provided surveying and mapping services for over 28 years <br />to various municipalities. <br />Mr. Dhuruva (Dru) Badri, PE (11) from Professional Services Industries, Inc. will be the lead geotechnical <br />engineer on this contract. Mr. Badri's experience includes coordination, monitoring and evaluation of subsurface <br />explorations, laboratory studies, construction operations and geotechnical report preparation. <br />Justin Freedman, MS (12), from E Sciences will serve as the lead environmental engineer for this contract. He <br />specializes in municipal consulting and has provided plan review, landscape inspection, environmental assessments, <br />expert witness, permitting, ordinance development, street tree inventory, canopy assessments, carbon sequestration <br />analysis and wildlife permitting services to municipalities. <br />ABILITY TO MEET TIMELINES AND DEADLINES <br />We believe that the successful completion of a project is highly dependent on the experience of the staff assigned <br />to the project. RJ Behar will commit the personnel necessary and monitor project progress to meet schedules. <br />As previously stated, RJ Behar has the commitment of completing every contracted project to the satisfaction of <br />the client. Our management spreadsheets assist us for control of each project and we discuss each project in our <br />project management weekly meetings. At these meetings, we go over all the items that need to be completed, the <br />budget, and the staff needed to complete each item. Our company President, who will also serve as Principal -In- <br />Charge on this contract, presides over these meetings to insure each project and task is allocated the necessary <br />resources. <br />11 <br />qR.J.Behar RFQ No. 14 -07 -02 1 Page 14. 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.