Laserfiche WebLink
El <br />11 <br />L <br />J I <br />CLIENT <br />p��:vas <br />Florida Department of <br />Transportation, District 6 <br />1000 NW 111 Street <br />Miami, Florida 33172 <br />Mr. David Mendez, PE <br />Tel: (305) 470 -5207 <br />Fax: (305) 470 -5547 <br />david.mendez@dot.stalefl.us <br />RJ BEHAR'S ROLE <br />Roadway plans, public involvement, <br />traffic control, drainage improve- <br />ments, signing & pavement markings, <br />utility coordination and permitting <br />PROJECT STARTED: 1212000 <br />PROJECT COMPLETED: 1212002 <br />COST /FEES PAID: $432,000 <br />CONST. COST: 54,000,000 <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J. Behar, PE <br />Principal in Charge <br />Israel Magrisso, PE <br />Project Manager <br />Juan H Vazquez, PE, PH, BCEE <br />Drainage Engineer <br />Maikel Gonzalez, PE <br />Project Engineer <br />Adrian Gonzalez, El <br />Project Engineer <br />The scope of the project included preparing construction drawings for 4 <br />miles of major arterial resurfacing. The construction included <br />resurfacing the existing road and implementing drainage improvements <br />using injection wells and gravity wells at 19 locations; 14 pump stations <br />and 28 injection wells were designed. The plans included pump station <br />design, pollution control structures, electrical design and all details for <br />the pressurized injection wells. The project also included extensive <br />public involvement, new pavement markings, traffic control plans and <br />utility coordination. <br />A CDS surface water treatment proprietary basin was designed for this <br />project to treat the stormwater before discharge. The CDS basin was <br />designed to remove 80 %ofpolluianis from surface waters. <br />R.J.Behar & Company, Inc. <br />II' <br />Engineers. Planners <br />RFQ No. 14 -07 -02 1 Page 12.28 <br />