My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />E <br />0 <br />J. <br />11 <br />CLIENT <br />The scope of services included review and approval of development <br />Town of Southwest Ranches <br />site plans and building permits, site inspections, survey of sites, soil <br />13400 Griffin Road <br />borings and plat processing coordination/preparation. <br />Southwest Ranches, FL 33330 <br />Tel: (954) 343 -7441 <br />RJ Behar was also the Town's engineering representative with <br />Fax : (954) 434 -1490 <br />regulatory agencies, zoning and permitting. We provided capital <br />engineering project oversight, design and permitting, review of <br />capital engineering implementation and planning, overview of <br />RJ BEHAR'S ROLE <br />roadway, bridge and trail development. <br />inspection services, reviewed all <br />building permits, fill permits, and <br />RJ Behar prepared tertiary drainage design, permitting, <br />developed cost estimates, prepared <br />coordination and drainage plan update. We also provided water <br />construction documents <br />quality management, L-AP certifications, coordinated with Town's <br />Planner during the zoning and permitting process and expert <br />testimony on behalf of Town for court and code enforcement <br />PROJECT STARTED: 2004 <br />proceedings. <br />PROJECT COMPLETED: 2010 <br />DESIGN CONTRACT DURATION: N/A <br />COST /FEES PAID: Varied monthlyi <br />according to the reviews <br />!` <br />CONST. COST: N/A <br />- <br />CHANGE ORDERS: None <br />�f• <br />VALUE OF CHANGE ORDERS: N/A <br />``'' <br />1 <br />RJ BEHAR'S KEY PERSONNEL <br />Javier Rodriguez, PE <br />Project Manager _ t <br />Paola Riveros, PE ~ <br />Plans Production <br />I <br />Richard Bolt <br />Permit Review <br />Daimian D. Leslie, El <br />Project Engineer <br />Claudia M. Lamus, PE "R <br />TraffcAnalyses <br />Gaston Baranda <br />Permitting (.' <br />Carlos Hernandez, PE � F <br />Inspection Engineer = ' IV <br />�.'G,.^ via .1 Ti <br />R.J.Behar & Company, Inc. <br />Engineers. Planners <br />RFQ No. 14 -07 -02 1 Page 12. 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.