My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,J <br />11 <br />11 <br />J� <br />CLIENT <br />Broward County Water and <br />Sewer Services Department <br />Subconsultantto: <br />Miller Legg and Associates <br />6301 N. W. 5`" Way, Suite 1400 <br />Fort Lauderdale, Florida 33309 <br />Mr. Darren Badore <br />Tel: (954) 491 -2800 <br />Fax: (954) 491 -0788 <br />dbadore@,miller-leZQ.com <br />RJ BEHAR'S ROLE <br />Consultant for drainage <br />construction management <br />review services <br />RJ Behar provided drainage design; cost estimating of the drainage <br />system; permitting of the drainage system; and peer review of. <br />• Water distribution plans, <br />• Sewer distribution plans, <br />• Water reuse master plan, <br />• Water reuse design, <br />• Streets and sidewalks plans. <br />The peer reviews were being performed at each phase of the design. RJ <br />Behar also provided construction management and inspection services <br />during the construction phase. <br />The drainage design consisted of evaluation and identification of the food <br />prone areas, field reviews, data collection, coordinated with the <br />design, geotechnical subconsuliant, hydrologiclhydraulic modeling and plans <br />and peer preparation of the drainage improvements. The drainage system consists <br />of a system of exftltration systems, the addition of drainage catch basins, <br />control structures with weirs and connection to existing outfalls. <br />PROJECT STARTED: 31512007 <br />PROJECT COMPLETED: <br />7/15/2013 <br />Cost /FEES PAID: 8881,268.00 <br />CONST. COST: 888,000,000 (Est) <br />RJ BEHAR'S KEY PERSONNEL <br />Juan H. Vazquez, PE, PH, BCEE <br />Engineer of Record <br />Carmen A. Aponte, MSE, CEI <br />Project Engineer <br />Paola Riveros, PE <br />Project Engineer <br />Anthony V. Alfred, PE <br />Peer Reviews <br />Sonia M. Torres, PE <br />Peer Reviews <br />Sandra Sequeira, MS, EI <br />Project Engineer <br />RJ Behar also coordinated permitting with the Florida Department of <br />Transportation (Chapterl4 -86), Broward County Environmental <br />Protection Department and South Florida Water Management District. <br />O R.J.Behar & Company, Inc. <br />II�tJTII <br />Engineers. Planner s <br />RFQ No. 14 -07 -02 1 Page 12.33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.