Laserfiche WebLink
0 <br />LI <br />J` <br />CLIENT <br />City of Sunrise <br />3495 N. Hiatus Road, Suite 200 <br />Sunrise, Florida 33351 <br />Mr. John Cowling, PE <br />Project Manager <br />Tel: (954) 572 -2486 <br />icowl inencityofsunrise. ore <br />RJ BEHAR'S ROLE <br />Project management, site plans, and <br />permitting <br />PROJECT STARTED: 71612007 <br />PROJECT COMPLETED: 1212009 <br />COST /FEES PAID: 824,000 <br />CONST. COST: 8426,000.00 <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J Behar, PE <br />Principal in Charge <br />Javier Rodriguez, PE <br />Engineer of Record /Project Manager <br />Marlin Scattolini, El <br />Project Engineer <br />John Miller <br />Construction Observation <br />R. J Behar & Company was contracted by the City of Sunrise to provide <br />engineering design services for the rehabilitation of the banks of the <br />Springtree Canal, located between NW 83d Avenue and Fairway Road. <br />The project included construction of approximately 900 linear feet of <br />stabilization along the banks, maintaining a 4:1 slope above water level <br />and 2.5:1 below the water level. RJ Behar provided project management, <br />developed the site plans, coordinated with subconsuhants, obtained all <br />the permitting and provided construction observation services. <br />II14R.J.Behar & Company, Inc. <br />Engineers • P l a n n e r s <br />RFQ No. 14 -07 -02 1 Page 12.35 <br />