Laserfiche WebLink
J. <br />r <br />CLIENT <br />City of Pembroke Pines <br />Public Services Department <br />13975 Pembroke Road <br />Pembroke Pines, FL 33027 <br />Mr. George Wrves <br />Tel: (954)435 -6581 <br />Email: gwrves@ppines.com <br />FDOT District 4 <br />Ms. Sierra Evans <br />FDOT Project Manager <br />Tel: (954) 892 -1380 <br />RJ BEHAR'S ROLE <br />Construction Engineering Inspection <br />and Management Services <br />PROJECT STARTED: 1008 <br />PROJECT COMPLETED: 2010 <br />COsr /FEES PAID: 51,592,490.03 <br />CONST. COST: $11.2 Million <br />is CHANGE ORDERS: 12 - These <br />were for additional work and <br />unforeseen conditions <br />TIME EXTENSIONS: 4 months <br />FM #:41415225801 <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J Behar, PE <br />Principal in Charge <br />David Romano, PE <br />Senior Project Engineer <br />Rafael Urdaneta, CCM <br />Project Administrator <br />Stacy Sookdew -Sing <br />Resident Compliance Specialist <br />Michael Owenby <br />Senior Roadway Inspector <br />Mauricio Pinzon <br />Roadway Inspector <br />The scope of this project consisted of an $11.1 million Local Agency <br />Program (LAP) construction project between the City of Pembroke Pines <br />and the Florida Department of Transportation, District 4. This was a <br />federally funded project consisting of urbanized improvements to the <br />1 -75 (SR -93) /Pines Boulevard (SR -810) Interchange. <br />The project included modifying the existing interstate overpass, entrance <br />and exit ramps from a rural configuration to an urban configuration, as <br />well as widening, signalization, landscaping, and access management <br />improvements along Pines Boulevard. "No- excuse Bonus" (150K) and <br />"Incentive/Decentive" contracting methods were utilized. <br />RJ Behar provided full construction engineering inspection and <br />management services. <br />R.J.Behar & Company, Inc. <br />IC�t�Tll Engineers • Planner s <br />RFQ No. 14 -07 -02 1 Page 12.37 <br />