My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t„ = EAST 4TH AVENUE IMPROVEMENTS <br />I x, CITY OF HIALEAH. FLORIDA— 'LAP /ARRA PROJECT <br />G� <br />CLIENT <br />City of Hialeah <br />5601 East 8" Avenue <br />Hialeah, FL 33011 <br />Mr. Jorge E. Hernandez <br />Project Manager <br />Director, Streets Division <br />Tel (305) 687 -1611 <br />Fax (305) 687 -1631 <br />E -mail: iehernandez@hialeahA.gov <br />RJ BEHAR'S ROLE: <br />Design, roadway improvements, <br />milling and resurfacing, drainage, <br />signing, pavement and markings <br />plans <br />PROJECT STARTED: 0512009 <br />PROJECT COMPLETED: 913012009 <br />COST/ FEES PAID: $48,264 <br />CONST. COST: $636,630.79 <br />PROJECT LENGTH: 1.239 miles <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J Behar, PE <br />Principal in Charge /Project Manager <br />Rohan Punit, EI <br />Project Engineer <br />Marlin Scattolini <br />Project Engineer <br />Richard Bolt <br />Project Engineer <br />0 <br />RJ Behar was contracted by the City of Hialeah to provide roadway <br />improvements on East 4th Avenue from Hialeah Drive to East 11" Street <br />within the City of Hialeah. The scope of this project consisted of <br />extensive field work in order to locate roadway deficiencies over the <br />project's 11 block span. Milling and resurfacing, ADA improvements, <br />curb, driveway and sidewalk repairs, utility locations, and signing and <br />pavement marking repairs were some of the aspects documented for this <br />project. <br />This was a FDOT Local Agency Program (LAP) Project. One of the <br />challenges on this project was to prepare roadway plans which would <br />improve the roadway corridor while minimizing federal funds the City <br />would have to use. This project was part of the American Recovery and <br />Reinvestment Act (ARRA), which is supported by federal funds. Project <br />length: 1.139 miles. <br />;L V <br />t s :.1 <br />IS <br />R.J.Behar & Company, Inc. <br />II�t�Tll <br />Engineers. Planners <br />RFQ No. 14 -07 -02 1 Page 1 2.41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.