My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />u <br />J <br />CLIENT <br />City of Pembroke Pines <br />Public Services Department <br />13975 Pembroke Road <br />Pembroke Pines, FL 33017 <br />Mr. George Wrves <br />Tel: (954)435 -6582 <br />Email: gwrves@ppines.com <br />RJ BEHAR'S ROLE <br />Construction Engineering Inspection <br />Services <br />PROJECT STARTED: 121112009 <br />PROJECT COMPLETED: 0512010 <br />COST /FEES PAID: 556,000 <br />CONST. C OST: S577,644.00 <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J Behar, PE <br />Principal in Charge <br />David G. Romano, PE <br />Project Manager/ <br />Senior Project Engineer <br />Rafael Urdaneta, CCM, El <br />Project Administrator <br />Stacy Sookdew -Sing <br />Resident Compliance Specialist <br />(RCS) <br />Mauricio Pinzon <br />Roadway Inspector <br />John Miller <br />Roadway Inspector <br />RJ Behar is providing full construction engineering inspection services <br />for sidewalk improvements on the following projects within the City of <br />Pembroke Pines. <br />1. N. W. 190 Avenue — Between Taft Street and Sheridan Street <br />The scope of this project includes the addition of approximately 2,000 If. <br />of six foot sidewalk, this is adjacent to the west right -of -way on NW 196" <br />Avenue. Grading of the adjacent swale area and sod restoration with <br />Argentina Bahia Sod is also included. <br />2. Pembroke Road —Between S.W. 120 Avenue to S.W. 1456 Avenue <br />This project includes the addition of approximately 5,300 Itf of six foot <br />and five foot sidewalks, this is adjacent to the north right -of -way of <br />Pembroke Road. New ADA ramps with detectable warning surfaces will <br />be installed. Thickened edge sidewalks with pedestrian handrails are to <br />be installed where drop off conditions warrant, i.e. where existing <br />drainage inlets align south of the proposed sidewalk. Drainage <br />improvements, new curb installation, guardrail removal, grading of <br />adjacent swales and sod restoration are also proposed. <br />3. Pembroke Road — Between S. W. 166•x-" Avenue and Silver Shores <br />Boulevard <br />The project scope includes the addition of approximately 15,3001f. of six <br />foot sidewalk, this is adjacent to the north right -of -way on Pembroke <br />Road. Thickened edge sidewalks with pedestrian handrails, new ADA <br />ramps with detectable warning surfaces, grading of adjacent swales and <br />sod restoration are also planned. <br />R.J.Behar & Company, Inc. <br />I!_�TTiI <br />Engineers. Planners <br />RFQ No. 14 -07 -02 1 Page 12.43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.