My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 14 -07 -02 1 Page 12.57 <br />Overseas Highway <br />Client HDR Engineering <br />for the Florida Department of Transportation District Six <br />Project Dates July 2012 — Ongoing <br />County Monroe <br />Description <br />E Sciences, Incorporated (E Sciences), as a subconsultant to HDR Engineering, Inc., is providing assistance <br />with the environmental, drainage and permitting services required on the Overseas Highway roadway <br />improvements from north of Old SR-4A/MM 77.5 to Jerome Avenue /MM 81.41 located in Monroe County, <br />Florida. <br />E Sciences conducted the wetland and listed species survey for the project corridor. Mangroves, forested area <br />and beach are located adjacent to the project corridor and portions of the corridor cross over or are adjacent to <br />waters of the Florida Keys National Marine Sanctuary ( FKNMS). These waters are designated as an <br />Outstanding Florida Water (OFW), and as such are afforded special projection. Numerous protected species <br />utilize the FKNMS upland and offshore habitats in the project vicinity. Due to the nature of the project (i.e., <br />milling and resurfacing; addition of bike lanes in uplands; restoration of existing bike paths; pavement <br />markings), no direct wetland or listed species impacts are expected as a result of the project. However, special <br />attention to the surface water pollution prevention plan (SWPPP) and erosion control plan (ECP) will be <br />required to ensure impacts to the FKNMS are avoided. <br />® <br />E Sciences is working with the project engineer to avoid wetland impacts. This includes providing specific <br />items, such as dearly delineating areas which cannot be used for storage of equipment or materials; and <br />instructions for preventing any materials from bridge work falling into the water to ensure inadvertent impacts do <br />not occur. <br />i <br />' __� <br />p - -_� •. a e <br />o <br />_ •`..Cloi . <br />CSeiences <br />Rev811 212 0 1 4 <br />FOOT D6 Overseas Highway (7 -0084 -001) <br />RFQ No. 14 -07 -02 1 Page 12.57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.