My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. Information <br />L/'"�..To Build On <br />EnO—Or ns . consum"g . re,a g <br />Dorothy M. Wallace Cope Center, Miami, Florida. <br />The project will involve the construction of a canopy structure over the existing walkway present <br />along the south facade of the school buildings. In addition, new construction will include <br />stormwater management system(s). <br />Role: Geotechnical Engineering Services <br />Dates: April 2014 to on -going <br />Client: Mr. Marcel Douge, Project Manager, Miami -Dade County Public Schools (MDCPS) <br />Colonial Drive Elementary School, Miami, Florida. <br />The project will involve the construction of a new canopy structure and covered walkway. In <br />addition, new construction will include stormwater management system(s). <br />Role: Geotechnical Engineering Services <br />Dates: April 2014 to on -going <br />Client: Mr. Marcel Douge, Project Manager, Miami -Dade County Public Schools (MDCPS) <br />Howard Drive Elementary School, Miami, Florida. <br />The project will involve addition/expansions to six pairs of restrooms within the school property. <br />The expansion will be one -story, similar to the existing restroom. In addition the development <br />will include stormwater management system(s). <br />Role: Geotechnical Engineering Services <br />Dates: April 2014 to on -going <br />Client: Mr. Marcel Dougd, Project Manager, Miami -Dade County Public Schools (MDCPS) <br />® City of Doral Police Facility/Public Works Addition, Doral, Florida. <br />The project will involve structural additions to the existing Police Department and Public Works <br />Building. The building additions will be one -story, similar to the existing construction and <br />approximately ±6,500 square feet (SF) in area. The additions are planned west of the existing <br />construction. <br />Role: Geotechnical Engineering Services <br />Dates: March 2014 to on -going <br />Client: Mr. Rudy de la Torre, Chief of Construction, City of Dora] <br />Proposed Playgrounds at Various Miami -Dade Schools, Miami, Florida. <br />The project will consist of the construction of new playgrounds within four separate elementary <br />schools (Avocado Elementary School, Bowman Ashe /Doolin K -8 Center, Howard Drive <br />Elementary School, Whispering Pines Elementary School) located in Miami -Dade County, <br />Florida. The new playground will include a canopy /shade structure, concrete side walk and <br />playground equipment. <br />Role: Geotechnical Engineering Services <br />Dates: July 2014 to on -going <br />Client: Ms. Lourdes Rodriguez, AIA, Rodriguez Architects, Inc. <br />11 <br />RFQ No. 14 -07 -02 1 Page 12.64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.