Laserfiche WebLink
YULET MIGUEL, PE <br />CIVIL ENGINEERING <br />EDUCATION <br />B.S. Civil Engineering, Florida International University, 2009 <br />YEARS OF EXPERIENCE YEARS WITH RJ BEHAR <br />7 Years 2013 - Present <br />PROFESSIONAL SOCIETIES <br />• ASCE, VP Student Affairs <br />• SHPE, Member <br />PROFESSIONAL REGISTRATIONS <br />P. E. Florida License No. 7702812013 <br />ENGINEERING EXPERIENCE <br />Ms. Miguel has seven years of experience working on range of civil engineering projects. At RJ Behar, she is responsible <br />for support in the areas of design and permitting for multiple projects. These projects range from municipal to federal, with <br />job duties including site and drainage design, plan revisions, and utility and project coordination. <br />RELEVANT EXPERIENCE <br />Design Services for Lehman Causeway Wall, Sunny Isles Beach FISunny Isles Beach <br />Project Engineer — She assisted in the design of the privacy wall, she coordinated with the Utility companies, and assisted <br />in the RFI Reviews. — Scope of the project was to design an 8 -ft privacy wall, approximately 1,800 LF in length within FOOT <br />right -of way below the William legman causeway near Collins Avenue, <br />US-1/SR-5/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th Street, Miami -Dade County - FOOT D6 <br />Project Engineer — She was responsible for the production of roadway plans, signing and pavement marking plans and <br />signal plans in accordance with the FDOT's PPM and latest design standards. She also assisted with field visits, sign <br />inventory, utility Coordination process and project quantities. The scope of work includes milling and resurfacing, pavement <br />widening, median reconstruction, upgrading pedestrian facilities to comply with ADA requirements, signing and pavement <br />markings, bike lane designations, and providing signalization and operational improvements at the intersections. <br />US -1 Lateral Ditch Restoration, Indian River County, FL — FOOT District 4 <br />Project Engineer — She is responsible for the preparation of Lateral Ditch System Plans, profile, Cross sections, quantities, <br />SWPP and temporary maintenance of traffic (MOT) Plans. The purpose of this project is to analyze the existing drainage <br />conditions and re- establish or improve the original design section for each ditch with the goal of restoring adequate drainage <br />along US-1. <br />US- 11SR- 5Biscayne Boulevard from N of NE 121$1 Street to NE 151$1 Street, Miami -Dade County - FOOT D6 <br />Project Engineer - She was responsible for the preparation of roadway plans, signing and pavement marking plans; <br />developed quantities and assisted in the final preparation and submittal of the project and assisted in the assembly of the <br />Computation book and supporting documents.. The scope of services includes milling and resurfacing, signing and <br />pavement markings, traffic control plans and ADA and pedestrian features upgrades. <br />DesignBuild - SW 196th Avenue /Pembroke Road, Broward County, Florida — City of Pembroke Pines <br />Project Engineer — She is responsible for preparing roadway plans, signing and pavement markings, and coordination with <br />the City of Pembroke Pines and Broward County for plans permitting and approvals. <br />Design/Build of SW 207th Terrace/SW 54th Place, Broward County, FL — City of Pembroke Pines <br />Project Engineer responsible for the roadway plans. The new two-lane, two -way roadway will run from SW 2071t to SW <br />20P Avenue. <br />SR- 99711(rome AveJSW 177th Avenue from SR- 51US -1 to SW 29Th Street, Miami -Dade County, FL — FOOT District 6 <br />Project Engineer — She was responsible for the preparation of roadway, signing and pavement marking plans as per the <br />PPM Volume 2 and the current edition of the FDOT Design Standards. This project consisted of milling and resurfacing, as <br />well as, upgrading existing ramps and sidewalks to be ADA complaint and correcting cross slope deficiencies. This was a <br />Rehabilitation, Resurfacing and Restoration project (RRR <br />NW 2711 Avenue from NW 122nd Street to NW 135th Street, Miami -Dade County, FL — FOOT District 6 <br />Project Engineer — She was responsible for creating the roadway, signing and pavement markings and signalization plans. <br />This project was an urban divided six lane highway with sidewalk and curb and gutter on each side. The project consisted of <br />milling and resurfacing, sidewalk and curb and gutter repairs, reconstructing existing non -ADA compliant ramps and <br />WR.J.Behar <br />RFO No. 14-07-021 Page 13.24 <br />