Laserfiche WebLink
YULET MIGUEL. PE <br />sidewalks, minor drainage improvements and widening a left turn lane. She was responsible for coordination with the <br />® County and utilities for major improvements to upgrade pedestrian countdown signal heads, pedestrian detectors and new <br />pull boxes and signal loops. She was involved in the public information meeting and preconstruction meetings. <br />SW 192nd StreetlGrossman Farm Road from SW 1979, Avenue to SR 9971 Krome Avenue /SW 1771^ Avenue, Miami, <br />Florida — FDOT District 6 <br />Project Engineer — She was responsible for the roadway and signing marking plans for this rural unsignalized intersection <br />safety improvement project. The project included new paved shoulders, recapping existing pavement markings, adding new <br />drainage to eliminate water ponding at the intersections, and upgrading guardrail end treatments. She was also responsible <br />for the coordination and design of the installation of two new solar powered flashing beacons with advisory speed signs to <br />improve safety at the intersection of SW 197LI Avenue. <br />Neighborhood No. 2/North Shore — Indian Creek Drive from Abbott Avenue to 7151 Street FDOT ARRA, Miami Beach, <br />FL — City of Miami Beach Public Works <br />Project Engineer — She was responsible for the preparation of the roadway, signing and pavement markings, and <br />signalization plans for this federally funded ARRA project. This was an undivided corridor which included milling and <br />resurfacing, new ADA compliant ramps with brick paved crosswalks and a new signalization on NW 692, Street and Indian <br />Creek Drive. In addition, there were signal countdowns installed and pedestrian detectors. <br />Design -Build ARRA, Miami Lakes, Florida — Town of Miami Lakes <br />Project Engineer — Her responsibilities included the preparation of the roadway, signing and pavement marking plans for <br />this federally funded ARRA project. This project consisted of milling and resurfacing, minor reconstruction, sidewalk repairs, <br />and curb ramp upgrades. She also assisted in the preparation of the project's drainage plans and Maintenance of Traffic <br />(MOT) plans. <br />Miami River Greenway from SW 151 Court to South Miami Avenue, Miami -Dade County, Florida — City of Miami, <br />Capital Improvement Projects <br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and <br />pavement marking plans and the implementation of the Miami River Greenways Master Plan. This included widening the <br />existing 5.6 fool sidewalk to an 8 fool shared use path. Benches and amenities were placed along this corridor as part of <br />® the master plan along with a decorative sidewalk and landscaping. She was the main utility coordinator for the project in <br />order to relocate or adjust existing utilities along the project corridor. The Project also included a signing component of way <br />finding signs along the project corridor to inform pedestrians about the Miami River Greenways Project and direct them <br />towards the pathway <br />Miami River Greenway from NW N. Miami Avenue from NW 51h Street to NW 6th Street, Miami -Dade County, Florida — <br />City of Miami, Capital Improvement Projects <br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and <br />pavement marking plans. This included widening the existing 5-6 foot sidewalk to an 8 foot shared use path. Benches and <br />amenities were placed along this corridor as part of the master plan along with a decorative sidewalk and landscaping. She <br />was the main utility coordinator for the project in order to relocate or adjust existing utilities along the project corridor. The <br />Project also includes a signing component of way finding signs along the project corridor to inform pedestrians about the <br />Miami River Greenways Project and direct them towards the pathway. She also had close coordination with the landscape <br />architect, which was also an essential role in this project. <br />SW 18th Terrace, SW 2314 Road, SW 2P Road, and SW 22nd Road Between 51" and 11th street, Roadway <br />Improvements Project, Miami -Dade County, FL— City of Miami, Capital Improvement Projects <br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and <br />pavement marking plans, temporary traffic control plans, SWPP plans, generating quantities, and the utility coordination. <br />This project consisted of reconstructing minor sections of the roadway to achieve the correct runoff slope and reconstructing <br />the gutter to ensure proper flow line movement to the existing drainage system. She assisted in minor drainage <br />improvements and acquiring permits for this project. <br />SW 56N Avenue and SW 2nd Street and SW 5314 Avenue and SW 41' Street Traffic Calming Improvements, Miami - <br />Dade County, FL — City of Miami, Capital Improvement Projects <br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and <br />pavement marking plans, temporary traffic control plans, SWPP plans, generating quantities, and the utility coordination. <br />The scope was to design traffic calming inland to improve the intersection design. She assisted in the roadway design, <br />calculations, pavement design, quantities, and plan assembly. <br />R.J.Behar <br />RFO No. 14 -07 -021 Page 13.25 <br />