YULET MIGUEL. PE
<br />sidewalks, minor drainage improvements and widening a left turn lane. She was responsible for coordination with the
<br />® County and utilities for major improvements to upgrade pedestrian countdown signal heads, pedestrian detectors and new
<br />pull boxes and signal loops. She was involved in the public information meeting and preconstruction meetings.
<br />SW 192nd StreetlGrossman Farm Road from SW 1979, Avenue to SR 9971 Krome Avenue /SW 1771^ Avenue, Miami,
<br />Florida — FDOT District 6
<br />Project Engineer — She was responsible for the roadway and signing marking plans for this rural unsignalized intersection
<br />safety improvement project. The project included new paved shoulders, recapping existing pavement markings, adding new
<br />drainage to eliminate water ponding at the intersections, and upgrading guardrail end treatments. She was also responsible
<br />for the coordination and design of the installation of two new solar powered flashing beacons with advisory speed signs to
<br />improve safety at the intersection of SW 197LI Avenue.
<br />Neighborhood No. 2/North Shore — Indian Creek Drive from Abbott Avenue to 7151 Street FDOT ARRA, Miami Beach,
<br />FL — City of Miami Beach Public Works
<br />Project Engineer — She was responsible for the preparation of the roadway, signing and pavement markings, and
<br />signalization plans for this federally funded ARRA project. This was an undivided corridor which included milling and
<br />resurfacing, new ADA compliant ramps with brick paved crosswalks and a new signalization on NW 692, Street and Indian
<br />Creek Drive. In addition, there were signal countdowns installed and pedestrian detectors.
<br />Design -Build ARRA, Miami Lakes, Florida — Town of Miami Lakes
<br />Project Engineer — Her responsibilities included the preparation of the roadway, signing and pavement marking plans for
<br />this federally funded ARRA project. This project consisted of milling and resurfacing, minor reconstruction, sidewalk repairs,
<br />and curb ramp upgrades. She also assisted in the preparation of the project's drainage plans and Maintenance of Traffic
<br />(MOT) plans.
<br />Miami River Greenway from SW 151 Court to South Miami Avenue, Miami -Dade County, Florida — City of Miami,
<br />Capital Improvement Projects
<br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and
<br />pavement marking plans and the implementation of the Miami River Greenways Master Plan. This included widening the
<br />existing 5.6 fool sidewalk to an 8 fool shared use path. Benches and amenities were placed along this corridor as part of
<br />® the master plan along with a decorative sidewalk and landscaping. She was the main utility coordinator for the project in
<br />order to relocate or adjust existing utilities along the project corridor. The Project also included a signing component of way
<br />finding signs along the project corridor to inform pedestrians about the Miami River Greenways Project and direct them
<br />towards the pathway
<br />Miami River Greenway from NW N. Miami Avenue from NW 51h Street to NW 6th Street, Miami -Dade County, Florida —
<br />City of Miami, Capital Improvement Projects
<br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and
<br />pavement marking plans. This included widening the existing 5-6 foot sidewalk to an 8 foot shared use path. Benches and
<br />amenities were placed along this corridor as part of the master plan along with a decorative sidewalk and landscaping. She
<br />was the main utility coordinator for the project in order to relocate or adjust existing utilities along the project corridor. The
<br />Project also includes a signing component of way finding signs along the project corridor to inform pedestrians about the
<br />Miami River Greenways Project and direct them towards the pathway. She also had close coordination with the landscape
<br />architect, which was also an essential role in this project.
<br />SW 18th Terrace, SW 2314 Road, SW 2P Road, and SW 22nd Road Between 51" and 11th street, Roadway
<br />Improvements Project, Miami -Dade County, FL— City of Miami, Capital Improvement Projects
<br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and
<br />pavement marking plans, temporary traffic control plans, SWPP plans, generating quantities, and the utility coordination.
<br />This project consisted of reconstructing minor sections of the roadway to achieve the correct runoff slope and reconstructing
<br />the gutter to ensure proper flow line movement to the existing drainage system. She assisted in minor drainage
<br />improvements and acquiring permits for this project.
<br />SW 56N Avenue and SW 2nd Street and SW 5314 Avenue and SW 41' Street Traffic Calming Improvements, Miami -
<br />Dade County, FL — City of Miami, Capital Improvement Projects
<br />Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and
<br />pavement marking plans, temporary traffic control plans, SWPP plans, generating quantities, and the utility coordination.
<br />The scope was to design traffic calming inland to improve the intersection design. She assisted in the roadway design,
<br />calculations, pavement design, quantities, and plan assembly.