My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Company Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
R.J. Behar & Company Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:00:42 PM
Creation date
8/19/2014 12:08:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAOLA RIVER0S. P <br />Powerline Road (SR -845) Palm Beach County, Florida — FDOT District 4 <br />® Project Engineer in charge of the project's design. The project included milling and resurfacing of 3 miles of a major <br />collector, 8 signal upgrades, safety improvements and miscellaneous drainage improvements. <br />NW 87w Avenue (SR-973/Galloway Road) Miami -Dade Co., Florida — FDOT District 6 <br />Project Engineer who assisted with the preparation of drainage plans for new construction of a major arterial. The scope <br />includes final design and future new construction, roadway design, traffic operations, drainage, structure and construction. <br />Project Length: 1.90 miles <br />Hollywood Boulevard (SR -820) from SR -A1A to US -1 — FDOT District 4 <br />Project Engineer for the preparation of drainage plans, including coordination with utilities. <br />Southern Boulevard (SR -80) Drainage Design — FDOT District 4 <br />Project Engineer — She performed drainage area calculations and input data into the AdICPR stormwater model. She also <br />performed floodplain volume compensation calculations. <br />Blue Heron Boulevard — FDOT District 4 <br />Drainage Designer responsible for the preparation of drainage plans for a 3R project. <br />Alton Road (SR -907) — FDOT District 6 <br />Project Engineer who prepared the roadway plans for 4 miles of a 3R project as well as drainage structure sheets and <br />details. The project included injection wells and pump stations. <br />US-1 (Federal Highway) Hallandale Beach, Florida — FDOT District 4 <br />Project Designer — The RRR project went from the County Line to Hallandale Beach Boulevard. This project included the <br />design of 0.8 miles of a six -lane urban divided highway as well as minor drainage Improvements. <br />Kings Highway (SR -713) Resurfacing — FDOT District 4 <br />Project Engineer who assisted in the preparation of the 3R report. She prepared the Summary of Crash Analysis. <br />SW 62^" Court — Town of Southwest Ranches, Florida <br />Project Engineer for preparation of the roadway reconstruction plans and drainage plans. <br />North County Neighborhood Improvement Project — Broward County, Florida <br />Project Engineer in charge of drainage design and permitting. She performed design of French drains, stormsewer systems <br />® and prepared the drainage plans and report. <br />NE 151^ Avenue — City of Fort Lauderdale, Florida <br />Project Engineer — She was responsible for the master plan for a 0.8 mile roadway in Fort Lauderdale, Florida. The project <br />included resurfacing plans, marking and signing plans, and landscape plans. <br />NW/NE 131h Street — City of Fort Lauderdale, Florida <br />Project Engineer — She was responsible for the master plan for a 2.1 mile roadway in Fort Lauderdale, Florida. The project <br />included resurfacing plans, marking and signing plans, and landscape plans. <br />W. 771^ Street — City of Hialeah, Florida <br />Project Engineer for the preparation of roadway reconstruction plans and drainage plans. <br />W. 3r Street — City of Hialeah, Florida <br />Project Engineer for the preparation of roadway reconstruction plans and drainage plans. <br />W. 3311d Street Phases I and II — City of Hialeah, Florida <br />Project Engineer for the preparation of roadway reconstruction plans and drainage plans. <br />W. 74d, Street — City of Hialeah, Florida <br />Project Engineer for the preparation of roadway reconstruction plans and drainage plans. <br />E.181^ Street, E. 91^ Street and Curtis Drive — City of Hialeah, Florida <br />Project Engineer for the preparation of for the preparation of roadway reconstruction plans and drainage plans. <br />W. 7t1 Avenue M. 76th Street M. 75r^ Street — City of Hialeah, Florida <br />Project Engineer for preparation of roadway plans for city street improvements. <br />Palm Avenue Final Design from Okeechobee Road to 21m Street — City of Hialeah, Florida <br />Project Engineer for preparation of construction drawings for roadway reconstruction and improvements on Palm Avenue. <br />Ansin Boulevard — City of Hallandale Beach, Florida <br />Project Engineer for the reconstruction of one mile of City streets. She also designed the drainage systems. <br />11 <br />ItR.).Behar <br />RFQ No. 14 -07 -02 1 Page 13.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.