My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Assoc., Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Craig A. Smith & Assoc., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:33:06 AM
Creation date
8/19/2014 2:15:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NAME: <br />STORMWATER IMPROVEMENT & PUMP STATION <br />PHASES I, II, III <br />PROJECT ENTITY: <br />CITY OF SWEETWATER <br />500 SW 109th Ave <br />Sweetwater, FL 33174 <br />CONTACT NAME /NO.: <br />Mayor Manuel Marono <br />(305) 221 -0411 <br />PROJECT DESCRIPTION: <br />Installing Gravity Stormwater collection system, <br />Pump stations and Force Main Distribution system to <br />C-4 Canal. Phase I two pump stations each 20 CFS. <br />Phase III two pump stations each 40 CFS. <br />RESPONSIBILITIES: <br />Planning, design, permitting, bidding, construction <br />management and full time resident construction ob- <br />servation services. <br />CONSTRUCTION COST: <br />Phase I - $2,170,000 <br />Phase III - $4,270,000 <br />Craig A. Smith & Associates, Inc. <br />RFQ No. 14 -07 -02 <br />Page 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.