Laserfiche WebLink
PROJECT NAME: <br />STORMWATER IMPROVEMENT & PUMP STATION <br />PHASES I, II, III <br />PROJECT ENTITY: <br />CITY OF SWEETWATER <br />500 SW 109th Ave <br />Sweetwater, FL 33174 <br />CONTACT NAME /NO.: <br />Mayor Manuel Marono <br />(305) 221 -0411 <br />PROJECT DESCRIPTION: <br />Installing Gravity Stormwater collection system, <br />Pump stations and Force Main Distribution system to <br />C-4 Canal. Phase I two pump stations each 20 CFS. <br />Phase III two pump stations each 40 CFS. <br />RESPONSIBILITIES: <br />Planning, design, permitting, bidding, construction <br />management and full time resident construction ob- <br />servation services. <br />CONSTRUCTION COST: <br />Phase I - $2,170,000 <br />Phase III - $4,270,000 <br />Craig A. Smith & Associates, Inc. <br />RFQ No. 14 -07 -02 <br />Page 34 <br />