Laserfiche WebLink
PROJECT NAME: <br />PROJECT ENTITY <br />PHASE III AND IV OF THE STORMWATER <br />COLLECTION SYSTEM AND PUMP STATION <br />MASTER PLAN AND DESIGN <br />Town of Golden Beach <br />One Golden Beach Drive <br />Golden Beach, FL 33160 -2296 <br />CONTACT NAME /NO: Alexander Diaz, Town Manager <br />1 (305) 932 -0744 <br />PROJECT DESCRIPTION: A pumped stormwater collection, treatment and <br />disposal system to serve a portion of the Town of <br />Golden Beach. Phase III & IV pump station design, <br />two (2) submersible pumps each 12 CFS <br />RESPONSIBILITIES: Re- evaluation, design, permitting and construction <br />services for Phase III and IV of a six (6) phase <br />Stormwater Master Plan. <br />TOTAL PRICE: Phase III & IV— $2,031,000 <br />PROJECT INITIATION: Design— October 2000 <br />PROJECT COMPLETION: Currently under construction <br />Craig A. Smith & Associates, Inc. <br />RFQ No. 14 -07 -01 <br />Page 35 <br />TM OF 00t➢EN OF CH <br />PHASE III AND IV OF THE STORMWATER <br />COLLECTION SYSTEM AND PUMP STATION <br />MASTER PLAN AND DESIGN <br />Town of Golden Beach <br />One Golden Beach Drive <br />Golden Beach, FL 33160 -2296 <br />CONTACT NAME /NO: Alexander Diaz, Town Manager <br />1 (305) 932 -0744 <br />PROJECT DESCRIPTION: A pumped stormwater collection, treatment and <br />disposal system to serve a portion of the Town of <br />Golden Beach. Phase III & IV pump station design, <br />two (2) submersible pumps each 12 CFS <br />RESPONSIBILITIES: Re- evaluation, design, permitting and construction <br />services for Phase III and IV of a six (6) phase <br />Stormwater Master Plan. <br />TOTAL PRICE: Phase III & IV— $2,031,000 <br />PROJECT INITIATION: Design— October 2000 <br />PROJECT COMPLETION: Currently under construction <br />Craig A. Smith & Associates, Inc. <br />RFQ No. 14 -07 -01 <br />Page 35 <br />