Laserfiche WebLink
[ JI <br />1 <br />ii <br />1I <br />1 `l <br />k <br />i <br />Ij <br />N <br />,j <br />1751 <br />,1 <br />H <br />Hi <br />jl <br />C <br />Juan R. Alvarez, P.E. <br />Chief Engineer <br />Education <br />B.S., Civil Engineering, <br />University of Miami, 1979 <br />B.S., Architectural <br />Engineering, <br />University of Miami, 1979 <br />Registrations <br />Professional Engineer <br />Florida # 38522 <br />Professional <br />Affiliations <br />National Society of <br />Professional <br />Engineers <br />Florida Engineering <br />Society <br />Office Location <br />10305 NW 41 s Street <br />Suite 103 <br />Doral, FL 33178 <br />Employment with <br />Alvarez Engineers <br />1996 - Present <br />Alvarez Engineers, Inc. <br />Mr. Alvarez is the founder and President of Alvarez Engineers, a company specializing in <br />Civil Engineering, with offices in Miami, Florida. He has had extensive experience in the <br />past 34 years in Highway Design, Land Development, Community Development Districts, <br />Stormwater Management Systems and Architectural Engineering projects. <br />Mr. Alvarez' experience has enabled him to successfully complete and coordinate <br />projects with agencies such as the FDOT, MDX, Miami -Dade Public Works, Miami -Dade <br />DERM, Miami Dade WASD, SFWMD, the United States Army Corps of Engineers, the <br />DEP, SWFMD, Saint Johns River Water Management District, the City of Miami, the City <br />of Miami Beach, the City of North Miami, Surfside, Hallandale Beach and others. <br />SR -9 / NW 27"' Ave., from NW 1413t St. to I­96 On -Ramp (2.1 miles), Miami -Dade <br />County, FL - Chief Engineer. Project Scope. Resurfacing project for a 4-lane divided <br />roadway; design included roadway, signing and pavement marking, signalization and <br />lighting. Responsibilities: supervision of design and assuring the completeness of <br />technical design of design of roadway, SPM, signalization and lighting. Client: FDOT D6, <br />PM: Jose Barrera, P.E., (305) 470 -5260 Design: 2012 - 2014. <br />SR -959 / SW 57"' Ave., from Coral Way to Tamiami Trail (1.0 mile), Miami -Dade <br />County, FL. - Chief Engineer. Project Scope: Rehabilitation project for a 2 and 3 -lane <br />undivided roadway, project included design of signalization and lighting. <br />Responsibilities: supervision of design and assuring the completeness of contract plans <br />and specifications related to lighting and signalization. Client. GSA Group, Inc. as prime <br />consultant to FDOT, PM: Evelio Chavez, P.E., (305) 461 -5484 Design: 2008-2011 <br />NW 7'" Ave., from NW 183rd St. to NW 199' St., City of Miami Gardens (1.0 mile), <br />Miami -Dade County, FL. - Chief Engineer. Project Scope: Reconstruction of a 3 -lane <br />divided urban roadway, project included design of lighting. Responsibilities: supervision <br />of design and assuring the completeness of contract plans and specifications related to <br />drainage and lighting. Client. Metric Engineering, Inc. as prime consultant to City of <br />Miami Gardens, PM: Manuel Sauleda, P.E., (305) 235 -5098 Design: 2009 -2010 <br />SR -934 / 71" St., from Bay Dr. East to Collins Ave. (0.5 mile), Miami -Dade County, <br />FL - Roadway and Signing EOR. Project Scope: RRR of a 6-lane transitioning to a 3- <br />lane, undivided urban road, included roadway resurfacing, cross slope correction, <br />sidewalk and driveway reconstruction, drainage improvements, signing and pavement <br />markings, mast arm replacement, and relocation of a light pole. Responsibilities: <br />supervision of design and assuring the completeness of contract plans and specifications <br />related to the design of roadway, SPM, signalization and lighting. Client: FDOT D6, PM: <br />Adrian Manzanares, (305) 470 -5283 Design: 2007- 2010. <br />NW 114"' Ave., between Be St. and 82 "d St., City of Doral, Miami -Dade County, FL. <br />- Chief Engineer. Project Scope: Construction of a 0.13 mile divided urban roadway. <br />Responsibilities: supervision of design and assuring the completeness of contract plans <br />and specifications related to the design of lighting Client: Metric Engineering, Inc. as <br />prime consultant to City of Miami Gardens, PM: Manuel Sauleda, P.E., (305) 235 -5098 <br />Design: 2010 - 2010 <br />SR -AIIA, from 187' Ave. to William Lehman Cswy. (0.3 mile), City of Sunny Isles, <br />Miami -Dade County, FL. - Chief Engineer. Project Scope: Streetscape <br />improvements project for a 6 -lane divided roadway, which included the design of <br />roadway and lighting. Responsibilities: supervision of design and assuring the <br />completeness of contract plans and specifications related to roadway and lighting. <br />Client. O'Leary Richards Design & Associates as prime consultant to City of Sunny Isles <br />Beach, PM: Kathryn O'Leary Richards, ASLA, (305) 470 -5283 Design: 2008- 2008 <br />SR -933 / NW 12"' Ave., from NW 16"' St. to NW 29"' St. (0.9 mile), Miami -Dade <br />County, FL. - Project Manager, Roadway and Signing EOR, and Chief Engineer <br />Project Scope: Rehabilitation of a 4-lane divided roadway; included the reconstruction <br />of a plateau intersection, ADA upgrades, design of roadway, signalization at five <br />intersections and the replacement of the lighting system. Responsibilities: supervision <br />of design and assuring the completeness of contract plans and specifications related to <br />lighting and signalization. Client: FDOT D6, PM: Adriana Manzanares, (305) 470 -5283 <br />Design: 2001 - 2003 <br />29 <br />