|
Ena C. Hernandez, P.E.
<br />Project Engineer
<br />Education
<br />B.S., Civil Engineering,
<br />Florida International
<br />University, 2004
<br />Registrations
<br />Professional Engineer
<br />Florida # 72358
<br />Office Location
<br />Doral, Florida
<br />Office Location
<br />10305 NW W Street
<br />Suite 103
<br />Dora[, FL 33178
<br />Employment
<br />Alvarez Engineers, Inc.
<br />2013 - Present
<br />BCC Engineering, Inc.
<br />2013-2013
<br />New Millennium Design
<br />Consultants; Inc.
<br />2008 - 2013
<br />HNTB Design Consultant
<br />2007- 2008
<br />Metric Design Consultant
<br />2004-2007
<br />Alvarez Engineers, Inc.
<br />Ms. Ena Hernandez is a professional engineer with 10 years of experience in
<br />Transportation Engineering. Ms. Hernandez's has a solid background in the design
<br />phase services related to transportation projects with experience in highway /roadway
<br />design, horizontaVvertical alignment, storm water management, drainage, maintenance
<br />of traffic, signing and pavement markings, signalization, lighting, construction estimates,
<br />preparing Design Exceptions/Variations, Specs, Pavement Design Selection Reports and
<br />permitting.
<br />SR -9331 SW 1P Ave., from SW 6"' St. to SW 8' St. (0.13 mile), Miami -Dade County,
<br />FL - Signalization Engineer of Record - Project Scope. Intersection safety
<br />improvement project to upgrade guide signage and pedestrian signage.
<br />Responsibilities: design of signalization. Client: HSQ Group, Inc. as Prime Consultant
<br />to FDOT D6, PM: Nour Shehadeh, P.E., (561) 392 -0221 Design Dates: 2014 - Present
<br />SR -5 / US -1 / S. Dixie Hwy. at SW 104'h St. (0.5 mile), Miami Dade County, FL -
<br />Project Engineer - Project Scope: Intersection safety project to improve the horizontal
<br />alignment of US -1 and create an auxiliary lane on the NB direction. Design of roadway,
<br />SPM, signalization and lighting. Responsibilities: design of roadway, SPM, signalization
<br />and lighting, and for drafting the construction cost estimate. Client: FDOT D6, PM: Hong
<br />Benitez, P.E., (305) 4 70-54 71 Design Dates: 2013 - Present
<br />SR -821 (HEFT) Widening, from N. of SW 72nd St. to N. of SW 4CP St. (2.1 miles),
<br />Miami -Dade County, FL - Lighting Engineer of Record - Project Scope: Corridor
<br />improvements project for the capacity, operations and safety along the HEFT. The
<br />project includes side streets, ramps, and the SW 1171" Avenue Pedestrian
<br />Walkway/Trail. A new conventional lighting system is required including underdeck
<br />lighting, photometric analysis, light spillage, luminaires, load analysis, voltage drop
<br />calculations, and preparation of lighting plans. Responsibilities: design of lighting.
<br />Client. Beiswenger, Hoch & Associates, Inc., Inc. as prime consultant to Florida
<br />Turnpike Enterprise, PM: Carmen Aponte, M.S.E., (954) 334 -9000 Design Dates: 2014
<br />-2014
<br />SW 137"' Ave., from USt to SW 200"' St. (3.26 miles), Miami -Dade County, FL -
<br />Engineer of Record. Project Scope: New construction of SW 137d' Avenue which will
<br />be initially constructed as a four -lane divided facility between US1 and SW 248'" Street
<br />and a two -lane undivided facility between SW 248'" Street and SW 2001" Street. This
<br />project includes horizontal and vertical design, drainage, traffic control, signing and
<br />pavement markings, lighting, environmental, specifications and coordination with DERM
<br />and SFWMD. Responsibilities: design of roadway, SPM, lighting. Client: Miami -Dade
<br />Public Woks, PM: Raul Quintela, P.E., (305) 375 -3971, Design Dates: 2011 - 2013
<br />NE / NW 87d' St., from NW 2nd Ave. to Park Dr. (1.0 mile), Village of El Portal, Miami -
<br />Dade County, FL - Project Engineer. Project Scope: Roadway widening and milling
<br />and resurfacing, placing appropriate traffic pavement markings, retrofitting pedestrian
<br />ramps to meet ADA's requirements for this urban collector, undivided two-lane two -way
<br />road located within the Village of El Portal in Miami -Dade County. Included horizontal
<br />and vertical design, drainage, traffic control, signing and pavement markings,
<br />specifications, and quantities. Responsibilities: in charge of roadway design, drainage
<br />and SPM. Client: Village of El Portal, PM: Jason Walker, (305) 795 -7880, Design
<br />Dates: 2011 - 2012.
<br />NW 33`d St. Widening & Reconstruction, from NW 97°i Ave. to NW 870' Ave.
<br />(Design - Build) (1.0 mile), Miami -Dade County, FL - Design Engineer. Project
<br />Scope: Development of construction documents for the widening and reconstruction of
<br />approximately one -mile of urban arterial from 3- lanes, undivided to a 5 -1ane divided
<br />typical section. The project included horizontal and vertical design, drainage, traffic
<br />control, lighting, signalization and signing and pavement marking plans.
<br />Responsibilities: design of roadway and SPM. Client: City of Doral, PM: Jose Olivo, Jr.,
<br />P.E., (305) 593 -6740, Design Dates: 2009 - 2010.
<br />31
<br />
|