Laserfiche WebLink
Ena C. Hernandez, P.E. <br />Project Engineer <br />Education <br />B.S., Civil Engineering, <br />Florida International <br />University, 2004 <br />Registrations <br />Professional Engineer <br />Florida # 72358 <br />Office Location <br />Doral, Florida <br />Office Location <br />10305 NW W Street <br />Suite 103 <br />Dora[, FL 33178 <br />Employment <br />Alvarez Engineers, Inc. <br />2013 - Present <br />BCC Engineering, Inc. <br />2013-2013 <br />New Millennium Design <br />Consultants; Inc. <br />2008 - 2013 <br />HNTB Design Consultant <br />2007- 2008 <br />Metric Design Consultant <br />2004-2007 <br />Alvarez Engineers, Inc. <br />Ms. Ena Hernandez is a professional engineer with 10 years of experience in <br />Transportation Engineering. Ms. Hernandez's has a solid background in the design <br />phase services related to transportation projects with experience in highway /roadway <br />design, horizontaVvertical alignment, storm water management, drainage, maintenance <br />of traffic, signing and pavement markings, signalization, lighting, construction estimates, <br />preparing Design Exceptions/Variations, Specs, Pavement Design Selection Reports and <br />permitting. <br />SR -9331 SW 1P Ave., from SW 6"' St. to SW 8' St. (0.13 mile), Miami -Dade County, <br />FL - Signalization Engineer of Record - Project Scope. Intersection safety <br />improvement project to upgrade guide signage and pedestrian signage. <br />Responsibilities: design of signalization. Client: HSQ Group, Inc. as Prime Consultant <br />to FDOT D6, PM: Nour Shehadeh, P.E., (561) 392 -0221 Design Dates: 2014 - Present <br />SR -5 / US -1 / S. Dixie Hwy. at SW 104'h St. (0.5 mile), Miami Dade County, FL - <br />Project Engineer - Project Scope: Intersection safety project to improve the horizontal <br />alignment of US -1 and create an auxiliary lane on the NB direction. Design of roadway, <br />SPM, signalization and lighting. Responsibilities: design of roadway, SPM, signalization <br />and lighting, and for drafting the construction cost estimate. Client: FDOT D6, PM: Hong <br />Benitez, P.E., (305) 4 70-54 71 Design Dates: 2013 - Present <br />SR -821 (HEFT) Widening, from N. of SW 72nd St. to N. of SW 4CP St. (2.1 miles), <br />Miami -Dade County, FL - Lighting Engineer of Record - Project Scope: Corridor <br />improvements project for the capacity, operations and safety along the HEFT. The <br />project includes side streets, ramps, and the SW 1171" Avenue Pedestrian <br />Walkway/Trail. A new conventional lighting system is required including underdeck <br />lighting, photometric analysis, light spillage, luminaires, load analysis, voltage drop <br />calculations, and preparation of lighting plans. Responsibilities: design of lighting. <br />Client. Beiswenger, Hoch & Associates, Inc., Inc. as prime consultant to Florida <br />Turnpike Enterprise, PM: Carmen Aponte, M.S.E., (954) 334 -9000 Design Dates: 2014 <br />-2014 <br />SW 137"' Ave., from USt to SW 200"' St. (3.26 miles), Miami -Dade County, FL - <br />Engineer of Record. Project Scope: New construction of SW 137d' Avenue which will <br />be initially constructed as a four -lane divided facility between US1 and SW 248'" Street <br />and a two -lane undivided facility between SW 248'" Street and SW 2001" Street. This <br />project includes horizontal and vertical design, drainage, traffic control, signing and <br />pavement markings, lighting, environmental, specifications and coordination with DERM <br />and SFWMD. Responsibilities: design of roadway, SPM, lighting. Client: Miami -Dade <br />Public Woks, PM: Raul Quintela, P.E., (305) 375 -3971, Design Dates: 2011 - 2013 <br />NE / NW 87d' St., from NW 2nd Ave. to Park Dr. (1.0 mile), Village of El Portal, Miami - <br />Dade County, FL - Project Engineer. Project Scope: Roadway widening and milling <br />and resurfacing, placing appropriate traffic pavement markings, retrofitting pedestrian <br />ramps to meet ADA's requirements for this urban collector, undivided two-lane two -way <br />road located within the Village of El Portal in Miami -Dade County. Included horizontal <br />and vertical design, drainage, traffic control, signing and pavement markings, <br />specifications, and quantities. Responsibilities: in charge of roadway design, drainage <br />and SPM. Client: Village of El Portal, PM: Jason Walker, (305) 795 -7880, Design <br />Dates: 2011 - 2012. <br />NW 33`d St. Widening & Reconstruction, from NW 97°i Ave. to NW 870' Ave. <br />(Design - Build) (1.0 mile), Miami -Dade County, FL - Design Engineer. Project <br />Scope: Development of construction documents for the widening and reconstruction of <br />approximately one -mile of urban arterial from 3- lanes, undivided to a 5 -1ane divided <br />typical section. The project included horizontal and vertical design, drainage, traffic <br />control, lighting, signalization and signing and pavement marking plans. <br />Responsibilities: design of roadway and SPM. Client: City of Doral, PM: Jose Olivo, Jr., <br />P.E., (305) 593 -6740, Design Dates: 2009 - 2010. <br />31 <br />