My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sol-Arch
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Sol-Arch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:01:39 PM
Creation date
8/22/2014 4:31:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or to pro /ects, if not specified. <br />Complete one Section F for each roject.l 8 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Tamiami Airport Miami, FL PROFESSIONAL SERVICES CONSTRUCTIONI/7applicablel <br />Hanqars 1 and 2 1 2012 <br />23. PROJECT OWNER'S INFORMATION <br />a. mu.ttcl uwNLK b. YUINI OF WN IACI NAME c. YUIN/ OF CONi ACT TELEPHONE NUMBER <br />Miami Dade County I Jorge Marin 305 -876 -7565 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) - <br />Sol -ARCH was commissioned to be the project architects for two new metal hangars, 12,000 <br />sf. Approximate cost of construction was $1,700,000. Scope: design two metal hangars for <br />fuel loaded planes in conjunction with adjacent office space. The design will include'close <br />monitoring of the Kendall Tamiami Airport storm water management plan and all the NFPA <br />required fire suppression systems. In addition, Sol -ARCH will produce construction <br />documents and provide construction management. (Project is ongoing) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (612004) PAGE 3 <br />11) FIRM NAME <br />(2) FIRM LOCATION 1Gty and State) <br />(3) ROLE <br />a. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />(I I FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and Stare) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />)1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (612004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.