My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sol-Arch
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Sol-Arch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:01:39 PM
Creation date
8/22/2014 4:31:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the aggency, or 7o projects, if not Specified. <br />Com fete one Section F for each ro'ect. 9 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Staples Miami, FL PROFESSIONAL SERVICES CONSTRUCTION Ot applicable) <br />2008 2008 <br />23. PROJECT OWNER'S INFORMATION <br />a. VKU.mc I UWNLR b. PUIN I OF CUN I AC I NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Staples Bill Biondi 305- 284 -2211 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cast) <br />Sol-ARCH was commissioned to design and perform construction management for the Staples <br />retail store that was approx. 20,300 sf located at 2121 Biscayne Blvd in Miami. During the <br />planning and design phase we worked closely with the City of Miami and Mayor, Manny Diaz, <br />as the project would serve as the benchmark for the future city of Miami projects which now <br />require U.S.G.B.C. certification. Our project received a U.S.G.B.C. rating of "Gold ". The <br />approximate cost of construction was $2,000,000.00 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />Ill FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />131 ROLE <br />a. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />13) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and Stare) <br />13) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />13) ROLE <br />I. <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.