My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sol-Arch
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Sol-Arch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:01:39 PM
Creation date
8/22/2014 4:31:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PRO. <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />tPresent as many projects as requested by the agency, or 70 pro/ects, it not specified. <br />Complete one Section F for each project.) 10 <br />WD LOCATION Icily and State) 22. YEAR COMPLETED <br />MIA Edge Beam <br />Miami, FL <br />23. PROJECT OWNER'S INFORMATION <br />YdQQ:! <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami Dade County I Jorge Marin 305- 876 -7565 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT rync)ude scope, size, and cost) <br />The scope of work for the edge beam repair at terminal F, G and H entailed repairing all <br />areas of water leaking between terminal building and driveway. Spalled areas of concrete <br />have rusted through to the reinforcement. Prior to work being done, the existing <br />soffit had to be removed and inspected for damages. The challenge here was how soffits were <br />removed, stored, preserved, reinstalled, and ultimately performing the concrete restoration <br />work without interrupting terminal use. Size was 1000 lineal ft, and the approximate cost <br />was $450,000. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 1612004) PAGE 3 <br />11) FIRM NAME <br />(2) FIRM LOCATION icily and Statel <br />(3) ROLE <br />a. <br />I I1 FIRM NAME <br />12) FIRM LOCATION (City and Statel <br />(3) ROLE <br />b. <br />11) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />11) FIRM NAME <br />(2) FIRM LOCATION (City and Stare) <br />13) ROLE <br />d. <br />11) FIRM NAME <br />(2) FIRM LOCATION /City and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and Stare) <br />(3) ROLE <br />I. <br />STANDARD FORM 330 1612004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.