My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Keith & Schnars, P.A.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Keith & Schnars, P.A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:54:26 AM
Creation date
8/25/2014 11:51:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Of <br />-- <br />• Company records for any previous connections to the <br />Surveyor, supervise the office effort for conversion of <br />® <br />project City, District and other governmental agency <br />the field information into a completed survey document. <br />files; <br />The Project Manager coordinates all calculations, CADD <br />® <br />• Information either recorded or unrecorded; and <br />assignments, drafting duties, coordinates field to office <br />e <br />• Additional information that may be obtained from <br />efforts, and reviews projects for final submittal to the <br />B <br />other area professional surveyors. <br />project manager. Depending on the size of the project, <br />both the field and office work effort will be performed <br />® <br />K &S has an exceptional database of information compiled <br />simultaneously. <br />within the City. This includes past and ongoing company <br />® <br />projects. Our survey professionals have extensive <br />The Project Manager reviews and discusses all completed <br />® <br />experience finding the requisite information to begin a <br />project with our team members to ensure that they meet <br />project successfully. <br />the City goals and requirements. The office survey effort <br />0 <br />also undergoes a quality control review process. Our <br />® <br />Field Surveying Efforts <br />quality control team will guarantee that quality control <br />reviews are conducted. Once the quality control officer <br />B <br />Our Field Crew Coordinator is responsible for scheduling, <br />is satisfied with the product, the Project Manager reviews <br />® <br />monitoring and reviewing all field activities under the <br />the survey documents to ensure that they meet minimum <br />® <br />direction of the Project Surveyor. Specifically, the field crew <br />technical standards and conform to Rule SJ -17 of the <br />coordinator: <br />Florida Administrative Code. The Project Manager is the <br />® <br />final step in our quality control process, providing the City <br />® <br />Initiates all field efforts; <br />with exceptional results. No survey and mapping project is <br />Schedules field activities; <br />complete without the delivery of the final product to the <br />® <br />• Reviews safety issues /concerns with field crew <br />City for their review, followed by the use and acceptance of <br />personnel; <br />the project and final deliverables. <br />• Conducts daily reviews of project data; <br />® <br />• Ensures accuracy and completeness; and <br />All of these services will be performed in accordance with <br />® <br />Supervises Crews download field data collectors. <br />the City's specifications. Survey work will conform to the <br />Florida State Plane Coordinate System using the North <br />® <br />Field surveys are carried out using the latest data collection <br />American Datum of 1983 (1990 or 1999 adjustment) for <br />equipment and procedures. This effort includes the <br />horizontal control and the North American Vertical Datum <br />utilization of total station and electronic data collectors <br />of 1988 (NAVD) for vertical control or to the City's <br />® <br />employing data collection program. K &S also has crews fully <br />specified Datum. <br />® <br />proficient in utilizing the City's field codes. FR.Aleman & <br />Associates (FRA), teaming with K &S as a subconsultant, will <br />LANDSCAPE ARCHITECTURE <br />® <br />be assisting with the Location and Mapping of subsurface <br />® <br />utilities. Together we will use nondestructive digging <br />Our landscape architects will assist City staff in the various <br />equipment at critical points to determine the precise <br />landscape architecture projects, such as creating and <br />® <br />horizontal and vertical positions of underground utilities, as <br />enhancing green space, park improvements, greenways, <br />well as the type, size, condition, material and other related <br />complete streets, multi -modal transportation, traffic <br />characteristics. <br />calming, streetscapes, grant assistance, and providing plan <br />® <br />review services. K &S has a time - proven approach to <br />® <br />A quality control review is first performed by the Field <br />landscape architecture projects; it is an approach that has <br />Crew Chief, then by the Field Crew Coordinator, and <br />been refined over decades of experience. To begin, our <br />® <br />ending with a final review by the Project Surveyor. These <br />staff will meet with the City Project Manager to understand <br />® <br />quality control reviews are performed prior to the field <br />the history and purpose of the assigned task to ensure <br />survey information being forwarded to office staff to <br />prioritized goals are reflected in the project. K &S knows <br />® <br />alleviate errors and monitor field procedures. <br />that field assessment is critical to project success and we <br />® <br />place great emphasis on it-This process includes site visits <br />Office Survey Procedures <br />to photograph and systematically record the site, view <br />® <br />sheds, characteristics, opportunities and constraints. This <br />® <br />The field survey data is "moved into the office" for <br />information is reviewed and then utilized in reports and <br />processing in Eagle Point, creating drawings, and calculation. <br />presentations for meetings with the City and the public, if <br />® <br />A professional Surveyor and Mapper, and a Project <br />required. <br />Page 55 <br />ei j� �, KFITH and SCHNARS. P.A. <br />'�' FLom DAis6 ry LOCAL F1W <br />
The URL can be used to link to this page
Your browser does not support the video tag.