Laserfiche WebLink
AECOM Section 3 RFO No. 14 -07 -02 29 <br />Robert Woods, PE <br />Transportation <br />Education <br />Studied at the Universities of Vermont <br />and New Hampshire, and New <br />Hampshire Technical Institute <br />Licenses /Registrations <br />Professional Engineer, Florida, #45643 <br />Years of Experience <br />26 <br />Robert's experience is focused <br />in traffic operations analysis, <br />traffic safety analysis, access <br />management studies, <br />signal timing, signing and <br />pavement marking plans, <br />traffic calming, and all aspects <br />of traffic data collection. He <br />is proficient in the use of a <br />variety of traffic engineering <br />software applications <br />including HCS, SYNCHRO/ <br />SIMTRAFFIC, and CORSIM. <br />He is intimately familiar with <br />National and Local Agency <br />publications such as MUTCD, <br />FDOTTraffic Engineering <br />Manual and MUTS, <br />HSIP Guidelines, FDOT LOS <br />Handbook, Project Traffic <br />Forecasting Handbook, and <br />Interchange Handbook. <br />Similar Experience <br />Florida Department of Transportation - <br />District 4, 1 -595 Corridor Improvements <br />Public Private Partnership, Fort <br />Lauderdale, Florida. Senior project <br />manager and traffic control plan <br />(TCP) coordinator on the design -build <br />team for the 1 -595 public private <br />partnership (PPP) project.The project <br />involved 66 bridge structures and three <br />major interchanges in construction <br />of approximately 10.5 miles of three <br />reversible express lanes in the median <br />of existing 1 -595 between 1 -75 and 1 -95, <br />equipped with intelligent transportation <br />systems (ITS) and tolling infrastructure <br />for managed lanes. The construction <br />value is $1.3 billion and is expected to <br />be completed by summer of 2014. <br />South Carolina Department of <br />Transportation, Carolina Bays <br />Parkway, Myrtle Beach, South <br />Carolina. Roadway design manager for <br />the 22 -mile, 6 -lane freeway bypassing <br />Myrtle Beach with a new 4 -lane bridge <br />over the Atlantic Intracoastal Waterway <br />for a 4 -mile airport connector. Project <br />included a major directional interchange <br />with the Conway bypass, 26 bridges in <br />all with right -of -way acquisition, and <br />major utility relocation included in $232 <br />million contract. <br />Florida Department of Transportation, <br />Florida Department of Law <br />Enforcement, and Florida Department <br />of Agriculture, 1 -10 Agricultural <br />Interdiction Station, Pensacola, <br />Florida. Performed roadway design and <br />site engineering. <br />Florida Department of Transportation <br />- District 1, District -wide Minor Design <br />and Resurfacing Programs, Florida. <br />Engineer of record on 23 projects <br />for minor design program and seven <br />projects for resurfacing program; <br />engineer of record on traffic control <br />plans for SR 80 widening from two lanes <br />to four lanes in Hendry County. <br />Florida Department of Transportation <br />- District 2, SR 9A Design - Build, Duval <br />County, Florida. Developed 60 percent <br />plans for SR 9A project. <br />Florida Department of Transportation <br />- District 4, SR 816 (Oakland Park <br />Boulevard), Fort Lauderdale, Florida. <br />Engineer of record for a 6 -lane curb and <br />gutter with access management, turn <br />lanes, and drainage improvements. <br />Florida Department of Transportation <br />- District 4, 1 -95 at Okeechobee <br />Boulevard, Palm Beach County, <br />Florida. Traffic control plans. <br />Florida Department of Transportation - <br />District 5,1-95 and SR 528 Interchange, <br />Brevard County, Florida. Prepared <br />traffic control plans and signing and <br />pavement marking plans to increase <br />capacity to full cloverleaf with CD roads. <br />Florida Department of Transportation <br />- District 5, 1 -95 and Port St. John Road <br />Interchange, Brevard County, Florida. <br />Prepared traffic control plans and <br />signing and pavement marking plans. <br />Florida Department of Transportation <br />- Turnpike District, Suncoast Parkway, <br />Florida. Prepared traffic control plans <br />for 4.5 miles of 4 -lane, divided limited <br />access parkway. <br />