|
AECOM Section 3 RFO No. 14 -07 -02 29
<br />Robert Woods, PE
<br />Transportation
<br />Education
<br />Studied at the Universities of Vermont
<br />and New Hampshire, and New
<br />Hampshire Technical Institute
<br />Licenses /Registrations
<br />Professional Engineer, Florida, #45643
<br />Years of Experience
<br />26
<br />Robert's experience is focused
<br />in traffic operations analysis,
<br />traffic safety analysis, access
<br />management studies,
<br />signal timing, signing and
<br />pavement marking plans,
<br />traffic calming, and all aspects
<br />of traffic data collection. He
<br />is proficient in the use of a
<br />variety of traffic engineering
<br />software applications
<br />including HCS, SYNCHRO/
<br />SIMTRAFFIC, and CORSIM.
<br />He is intimately familiar with
<br />National and Local Agency
<br />publications such as MUTCD,
<br />FDOTTraffic Engineering
<br />Manual and MUTS,
<br />HSIP Guidelines, FDOT LOS
<br />Handbook, Project Traffic
<br />Forecasting Handbook, and
<br />Interchange Handbook.
<br />Similar Experience
<br />Florida Department of Transportation -
<br />District 4, 1 -595 Corridor Improvements
<br />Public Private Partnership, Fort
<br />Lauderdale, Florida. Senior project
<br />manager and traffic control plan
<br />(TCP) coordinator on the design -build
<br />team for the 1 -595 public private
<br />partnership (PPP) project.The project
<br />involved 66 bridge structures and three
<br />major interchanges in construction
<br />of approximately 10.5 miles of three
<br />reversible express lanes in the median
<br />of existing 1 -595 between 1 -75 and 1 -95,
<br />equipped with intelligent transportation
<br />systems (ITS) and tolling infrastructure
<br />for managed lanes. The construction
<br />value is $1.3 billion and is expected to
<br />be completed by summer of 2014.
<br />South Carolina Department of
<br />Transportation, Carolina Bays
<br />Parkway, Myrtle Beach, South
<br />Carolina. Roadway design manager for
<br />the 22 -mile, 6 -lane freeway bypassing
<br />Myrtle Beach with a new 4 -lane bridge
<br />over the Atlantic Intracoastal Waterway
<br />for a 4 -mile airport connector. Project
<br />included a major directional interchange
<br />with the Conway bypass, 26 bridges in
<br />all with right -of -way acquisition, and
<br />major utility relocation included in $232
<br />million contract.
<br />Florida Department of Transportation,
<br />Florida Department of Law
<br />Enforcement, and Florida Department
<br />of Agriculture, 1 -10 Agricultural
<br />Interdiction Station, Pensacola,
<br />Florida. Performed roadway design and
<br />site engineering.
<br />Florida Department of Transportation
<br />- District 1, District -wide Minor Design
<br />and Resurfacing Programs, Florida.
<br />Engineer of record on 23 projects
<br />for minor design program and seven
<br />projects for resurfacing program;
<br />engineer of record on traffic control
<br />plans for SR 80 widening from two lanes
<br />to four lanes in Hendry County.
<br />Florida Department of Transportation
<br />- District 2, SR 9A Design - Build, Duval
<br />County, Florida. Developed 60 percent
<br />plans for SR 9A project.
<br />Florida Department of Transportation
<br />- District 4, SR 816 (Oakland Park
<br />Boulevard), Fort Lauderdale, Florida.
<br />Engineer of record for a 6 -lane curb and
<br />gutter with access management, turn
<br />lanes, and drainage improvements.
<br />Florida Department of Transportation
<br />- District 4, 1 -95 at Okeechobee
<br />Boulevard, Palm Beach County,
<br />Florida. Traffic control plans.
<br />Florida Department of Transportation -
<br />District 5,1-95 and SR 528 Interchange,
<br />Brevard County, Florida. Prepared
<br />traffic control plans and signing and
<br />pavement marking plans to increase
<br />capacity to full cloverleaf with CD roads.
<br />Florida Department of Transportation
<br />- District 5, 1 -95 and Port St. John Road
<br />Interchange, Brevard County, Florida.
<br />Prepared traffic control plans and
<br />signing and pavement marking plans.
<br />Florida Department of Transportation
<br />- Turnpike District, Suncoast Parkway,
<br />Florida. Prepared traffic control plans
<br />for 4.5 miles of 4 -lane, divided limited
<br />access parkway.
<br />
|