|
f
<br />d
<br />(1
<br />a
<br />E�
<br />•Y
<br />y
<br />a
<br />j
<br />r
<br />i
<br />,Y
<br />c
<br />d
<br />rI
<br />v
<br />rr
<br />28
<br />RFO No. 14 -07 -02
<br />Guillermo Regalado, PE
<br />Civil Engineer
<br />Education
<br />MSc, Irrigation Engineering, Catholic
<br />University of Leuven, Belgium
<br />BSc, Civil Engineering, Pontificia
<br />Universidad Javeriana, Colombia
<br />Licenses /Registrations
<br />Professional Engineer (Civil), FL #64905
<br />Professional Engineer, Puerto Rico,
<br />#19248
<br />Professional Engineer (Civil), #25202-
<br />28775
<br />Years of Experience
<br />26
<br />Guillermo has served as a
<br />natural and water resources
<br />modeling team leader, project
<br />manager and project director
<br />for a variety of water resources,
<br />watershed management.
<br />stormwater management and
<br />restoration and conservation
<br />projects. Guillermo's project
<br />experience spans analysis,
<br />engineering design, and
<br />project management,
<br />integrated groundwater -
<br />surface water systems. natural
<br />resource restoration projects,
<br />watershed management,
<br />detention analysis. analysis
<br />and design of urban drainage
<br />systems. irrigation system
<br />design. environmental impact
<br />studies, and financial analysis
<br />of projects.
<br />Similar Experience
<br />Miami -Dade County Department
<br />of Environmental Resources
<br />Management, FEMA DORM Drainage
<br />Design, Miami, Florida. Design
<br />engineer for the design of drainage
<br />improvements to alleviate flooding
<br />and water quality problems in flood -
<br />prone neighborhoods throughout the
<br />county. Involved in the preparation of
<br />10 design packages, covering about 0.5
<br />square miles, and with a construction
<br />value of $1 million. Designs included
<br />catch basins, exfiltration trenches,
<br />pavement restoration, maintenance of
<br />traffic plans, hydraulic calculations,
<br />cost estimates, and utility conflict
<br />coordination.
<br />Miami -Dade County Department
<br />of Environmental Resources
<br />Management, C -1 Stormwater Master
<br />Plan, Miami, Florida. Project manager
<br />and H &H specialist for the development
<br />of a stormwater master plan for
<br />the 56.9- square -mile C -1 Basin in
<br />southeastern county, which contains
<br />145 subbasins. Managed evaluation and
<br />ranking of flooding and water quality
<br />problems areas; identification of control
<br />measures for flood and water quality
<br />control; hydrologic, hydraulic, and water
<br />quality modeling of control measures
<br />using XPSWMM; cost estimates and
<br />recommendation of control measures.
<br />GIS information was used to build a
<br />database containing all drainage related
<br />structures.
<br />Miami -Dade County Department
<br />of Environmental Resources
<br />Management, C -6 Stormwater Master
<br />Plan, Northeastern Miami -Dade
<br />County, Florida. Project manager and
<br />H &H specialist for the development
<br />of a stormwater master plan for the
<br />69- square -mile C -6 Basin (Miami River),
<br />which contains approximately 340
<br />sub - basins. Managing data review and
<br />statistical analysis of rainfall and flow
<br />records; compilation of drainage data
<br />from the cities; development of a digital
<br />Section 3
<br />1 ',
<br />T�.
<br />AECOM
<br />terrain model for the basin area and
<br />delineation of sub - basins using GIS;
<br />building and calibration of a hydrologic/
<br />hydraulic and water quality XPSWMM
<br />model for the basin; evaluation and
<br />ranking of flooding and water quality
<br />problems areas; identification and
<br />evaluation of flood and water quality
<br />control measures using XPSWMM; cost
<br />estimates and recommendation of
<br />control measures.
<br />Central Broward Water Control District,
<br />Western C -11 Basin, Water Quality
<br />Study 2004, Central Broward County,
<br />Florida. Project manager and senior
<br />modeler for the water quality study
<br />for the western C -11 Basin. Enhanced
<br />previous XPSWMM model created
<br />for the facilities update to determine
<br />the effects of adding twelve control
<br />structures to the western C -11 Canal.
<br />Study included determining the size
<br />and shape of the new structures so they
<br />would not have any flood impact on this
<br />water protected area. Design drawings
<br />and cost estimates were included in the
<br />final memorandum.
<br />South Florida Water Management
<br />District, Flood Impact Analysis for
<br />the North New River Canal, Broward
<br />County, Florida. Project manager
<br />and hydraulic modeling specialist
<br />for the analysis of the flood impact
<br />of decommissioning the G -123 pump
<br />station on the North New River Basin.
<br />Managed data review and statistical
<br />analysis of rainfall and flow records
<br />and compilation of drainage data
<br />from drainage districts. Developed
<br />an XPSWMM model for the entire
<br />area. Prepared cost estimates and
<br />recommendation of countermeasures.
<br />
|