Laserfiche WebLink
Car <br />REQUEST FOR QUALIFICATIONS N0. 14 -07 -02 <br />Creating a park that meets this <br />criteria begins at the earliest of <br />planning stages and continues <br />throughout the parks development. <br />Park design is a fluid process with <br />the park's ultimate design including <br />not only the facilities that are <br />dictated by the users but should <br />include many other functions that <br />the user may not have even thought <br />of. These activities should be <br />clustered so that they each build off <br />of each other to create the vibrant <br />destination that we all want. <br />The CTA approach would general <br />follow these steps: / <br />• Meet with City staff to-gain initialJnput & review_master plan. <br />• Perform Preliminary Site Investlga lotlo n of Existing Conditions including a survey. <br />• Prepare Preliminary Design Alfernatives'with Cost Opinions & <br />r <br />• Review with City1Staff and /or parks advisory board. 1 <br />• Solicit Input From Publit c. <br />• Prepare Final Plan with Cost Opinions. <br />• Present to City Commission. <br />If the park is ready to' move 'ahead to the consti <br />generally be followed: \ \ / <br />• Modify Design Plans and.Budget as Necessary. <br />• Provide Updates to Public %Affected Pa�rtiE�s as t. <br />• Prepare Final Construction Documents. <br />phase, the following steps would <br />Deems Necessary. <br />• Submit and Support Applications for Required Government Approvals and Permits. <br />ENGINEERING <br />Our understanding of the City's intends to hire an Engineering Consultant to perform a wide variety <br />of tasks including conceptual engineering schedule developments, permitting, cost estimates, <br />construction engineering services, storm water infrastructure and pump evaluation, compliance <br />reports, environmental assessments, storm water master planning, grant writing assistance, <br />transportation engineering, traffic, bidding assistance, project management, structural engineering <br />and engineering contract documents for all types of projects. <br />Douglas Taylor, P.E. will be responsible for quality control for all of the Sunny Isles Beach <br />Engineering projects. The following steps would are generalized as this is a continuing services <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53« STREET. FORT LAUDERDALE. FL 33309 1 P954.739.6400 <br />4 1 Page 8 <br />