Laserfiche WebLink
• <br />• <br />O <br />e <br />e <br />• <br />a <br />aa�•nnsaao-moata.c <br />SECTION 2 - QUALIFICATIONS <br />REQUEST FOR QUALIFICATIONS NO. 14-07 -02 <br />NW 2151Avenue, Fort Lauderdale and Oakland Park, Florida <br />Mr. Richard Tornese <br />County Engineer <br />Broward County Hwy Construction and Engineering Division <br />One University Drive, Suite 300B <br />Plantation, Florida 33324 <br />Phone: (954) 557 -4600 <br />Email: rtornese @broward.orE <br />Initial: February 2011 <br />Actual: August 2011 <br />Contract Amount: $1,596,600.29 <br />Actual Billed: $1,543,178.92 <br />Anticipated Cost: S8,300,000.00 <br />Actual Cost: $8,100,000.00 <br />NW 21st Avenue Project consisted of design and construction engineering inspection services of <br />Roadway, Regional Outfall, Storm Sewer, Signalization and Landscaping Improvements to an existing two <br />lane roadway through heavy commercial and residential area from north of Oakland Park Boulevard to <br />NW 19th Street. Roadway was re- aligned to provide for an additional landscaped buffer area between the <br />commercial and residential property. This regional outfall will serve approximately 400 acres of existing <br />residential developments in Fort Lauderdale and Oakland Park, Oakland Park Boulevard drainage relief <br />and NW 21st Avenue. The outfall will be jacked under the CSX Railroad into the Interstate 95 Right -of -Way <br />then north to the C -13 Canal. Along with the roadway realignment, new storm sewer was designed and <br />constructed and exfiltration trench added for water quality treatment to offset the effect of the additional <br />pavement. This Project entailed significant coordination between numerous agencies of the State, County <br />and Federal Governments. Signal replacements are proposed at Oakland Park Boulevard and NW 26th <br />Avenue as part of this Project. <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53f° STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 44 <br />P.ROIECLNAME�' <br />CLIENT <br />COMPLETION <br />DATE <br />CTA <br />FEES <br />CONSTRUCTION <br />COST <br />PROJECT <br />SUMMARY <br />SECTION 2 - QUALIFICATIONS <br />REQUEST FOR QUALIFICATIONS NO. 14-07 -02 <br />NW 2151Avenue, Fort Lauderdale and Oakland Park, Florida <br />Mr. Richard Tornese <br />County Engineer <br />Broward County Hwy Construction and Engineering Division <br />One University Drive, Suite 300B <br />Plantation, Florida 33324 <br />Phone: (954) 557 -4600 <br />Email: rtornese @broward.orE <br />Initial: February 2011 <br />Actual: August 2011 <br />Contract Amount: $1,596,600.29 <br />Actual Billed: $1,543,178.92 <br />Anticipated Cost: S8,300,000.00 <br />Actual Cost: $8,100,000.00 <br />NW 21st Avenue Project consisted of design and construction engineering inspection services of <br />Roadway, Regional Outfall, Storm Sewer, Signalization and Landscaping Improvements to an existing two <br />lane roadway through heavy commercial and residential area from north of Oakland Park Boulevard to <br />NW 19th Street. Roadway was re- aligned to provide for an additional landscaped buffer area between the <br />commercial and residential property. This regional outfall will serve approximately 400 acres of existing <br />residential developments in Fort Lauderdale and Oakland Park, Oakland Park Boulevard drainage relief <br />and NW 21st Avenue. The outfall will be jacked under the CSX Railroad into the Interstate 95 Right -of -Way <br />then north to the C -13 Canal. Along with the roadway realignment, new storm sewer was designed and <br />constructed and exfiltration trench added for water quality treatment to offset the effect of the additional <br />pavement. This Project entailed significant coordination between numerous agencies of the State, County <br />and Federal Governments. Signal replacements are proposed at Oakland Park Boulevard and NW 26th <br />Avenue as part of this Project. <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53f° STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 44 <br />