Car <br />«.�•nondrm�a.,ea �c <br />SECTION 2 - QUALIFICATIONS <br />REQUEST FOR QUALIFICATION NO. 14 -07 -02 <br />Pine Trails Park, Phases I thru III, Parkland, Florida <br />IAAaLkgJ'J' LJ64h17 Craven Thompson & Associates, Inc. (CTA) was the civil engineer for the 80- <br />acre multi -phase Pine Trails Park located in the City of Parkland. Phase I <br />consisted of 40 acres of development and included extensive earthwork, <br />construction of a 5 -acre lake along with soccer fields, basketball courts, <br />walkways, lighting and an amenities building and associated parking. <br />Phases I and II CTA worked closely with the City of Parkland and the design team led by Edward D. Stone <br />& Associates, Inc. to address environmental, earthwork, utility and drainage issues. Phase I construction <br />was completed in the fourth quarter of 2003. Phase II was a 20 -acre section of the park, the site work <br />construction was completed in 2007. CTA was the prime consultant for the 12.8 Acre Phase III portion of <br />the Pine Trails Park. Phase III consisted of three softball fields, paved parking, lighting and paved <br />pedestrian plazas. Phase III construction was completed in the fourth quarter of 2008. As lead <br />consultant of the Phase III design team, CTA worked closely with the City of Parkland to finalize the <br />design. CTA's responsibilities included Site, Civil, Landscape design, including project management and <br />coordination of all design professionals. Contract administration and observation was also included within <br />the scope of the project. <br />CRAVEN THOMPSON & ASSOCIATES, INC. 13563 NW 531d STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 46 <br />(PHASES I AND 11): <br />(PHASE III): <br />Mr. Eric Propes <br />Mr. Brian Archer, Public Works Director <br />Edward D. Stone & Associates <br />City of Parkland <br />1512 E. Broward Blvd., #.110 <br />6600 University Drive <br />Fort Lauderdale, FL 33301 <br />Parkland, FL 33067 <br />Phone: (954) 524 -3330 <br />Phone: (954) 757 -4121 <br />Email: epropes @edsaplan.com <br />Email: barcher @cityofparkland.org <br />' • ►1 <br />Phase I: 411 Quarter of 2003 <br />Phase II: 41h Quarter of 2007 <br />Phase III: 411 Quarter of 2008 <br />Phase III: $1.8 Million <br />IAAaLkgJ'J' LJ64h17 Craven Thompson & Associates, Inc. (CTA) was the civil engineer for the 80- <br />acre multi -phase Pine Trails Park located in the City of Parkland. Phase I <br />consisted of 40 acres of development and included extensive earthwork, <br />construction of a 5 -acre lake along with soccer fields, basketball courts, <br />walkways, lighting and an amenities building and associated parking. <br />Phases I and II CTA worked closely with the City of Parkland and the design team led by Edward D. Stone <br />& Associates, Inc. to address environmental, earthwork, utility and drainage issues. Phase I construction <br />was completed in the fourth quarter of 2003. Phase II was a 20 -acre section of the park, the site work <br />construction was completed in 2007. CTA was the prime consultant for the 12.8 Acre Phase III portion of <br />the Pine Trails Park. Phase III consisted of three softball fields, paved parking, lighting and paved <br />pedestrian plazas. Phase III construction was completed in the fourth quarter of 2008. As lead <br />consultant of the Phase III design team, CTA worked closely with the City of Parkland to finalize the <br />design. CTA's responsibilities included Site, Civil, Landscape design, including project management and <br />coordination of all design professionals. Contract administration and observation was also included within <br />the scope of the project. <br />CRAVEN THOMPSON & ASSOCIATES, INC. 13563 NW 531d STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 46 <br />