My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:53:10 AM
Creation date
8/26/2014 10:37:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Car <br />«.�•nondrm�a.,ea �c <br />SECTION 2 - QUALIFICATIONS <br />REQUEST FOR QUALIFICATION NO. 14 -07 -02 <br />Pine Trails Park, Phases I thru III, Parkland, Florida <br />IAAaLkgJ'J' LJ64h17 Craven Thompson & Associates, Inc. (CTA) was the civil engineer for the 80- <br />acre multi -phase Pine Trails Park located in the City of Parkland. Phase I <br />consisted of 40 acres of development and included extensive earthwork, <br />construction of a 5 -acre lake along with soccer fields, basketball courts, <br />walkways, lighting and an amenities building and associated parking. <br />Phases I and II CTA worked closely with the City of Parkland and the design team led by Edward D. Stone <br />& Associates, Inc. to address environmental, earthwork, utility and drainage issues. Phase I construction <br />was completed in the fourth quarter of 2003. Phase II was a 20 -acre section of the park, the site work <br />construction was completed in 2007. CTA was the prime consultant for the 12.8 Acre Phase III portion of <br />the Pine Trails Park. Phase III consisted of three softball fields, paved parking, lighting and paved <br />pedestrian plazas. Phase III construction was completed in the fourth quarter of 2008. As lead <br />consultant of the Phase III design team, CTA worked closely with the City of Parkland to finalize the <br />design. CTA's responsibilities included Site, Civil, Landscape design, including project management and <br />coordination of all design professionals. Contract administration and observation was also included within <br />the scope of the project. <br />CRAVEN THOMPSON & ASSOCIATES, INC. 13563 NW 531d STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 46 <br />(PHASES I AND 11): <br />(PHASE III): <br />Mr. Eric Propes <br />Mr. Brian Archer, Public Works Director <br />Edward D. Stone & Associates <br />City of Parkland <br />1512 E. Broward Blvd., #.110 <br />6600 University Drive <br />Fort Lauderdale, FL 33301 <br />Parkland, FL 33067 <br />Phone: (954) 524 -3330 <br />Phone: (954) 757 -4121 <br />Email: epropes @edsaplan.com <br />Email: barcher @cityofparkland.org <br />' • ►1 <br />Phase I: 411 Quarter of 2003 <br />Phase II: 41h Quarter of 2007 <br />Phase III: 411 Quarter of 2008 <br />Phase III: $1.8 Million <br />IAAaLkgJ'J' LJ64h17 Craven Thompson & Associates, Inc. (CTA) was the civil engineer for the 80- <br />acre multi -phase Pine Trails Park located in the City of Parkland. Phase I <br />consisted of 40 acres of development and included extensive earthwork, <br />construction of a 5 -acre lake along with soccer fields, basketball courts, <br />walkways, lighting and an amenities building and associated parking. <br />Phases I and II CTA worked closely with the City of Parkland and the design team led by Edward D. Stone <br />& Associates, Inc. to address environmental, earthwork, utility and drainage issues. Phase I construction <br />was completed in the fourth quarter of 2003. Phase II was a 20 -acre section of the park, the site work <br />construction was completed in 2007. CTA was the prime consultant for the 12.8 Acre Phase III portion of <br />the Pine Trails Park. Phase III consisted of three softball fields, paved parking, lighting and paved <br />pedestrian plazas. Phase III construction was completed in the fourth quarter of 2008. As lead <br />consultant of the Phase III design team, CTA worked closely with the City of Parkland to finalize the <br />design. CTA's responsibilities included Site, Civil, Landscape design, including project management and <br />coordination of all design professionals. Contract administration and observation was also included within <br />the scope of the project. <br />CRAVEN THOMPSON & ASSOCIATES, INC. 13563 NW 531d STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />2 1 Page 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.