My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:53:10 AM
Creation date
8/26/2014 10:37:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`wI <br />OM61.T0/9JIk.�8d1H K <br />REQUEST FOR QUALIFICATIONS NO. 14-07 -02 <br />rrcoraye;rtr <br />State Road 7 - US 441 Right -of -Way Survey for Design Purposes <br />Broward County, Florida <br />Mr. Alan Garcia, P.E., Director <br />Water & Wastewater Operations Division <br />Broward County Water and Wastewater Services <br />2555 West Copans Road <br />Pompano Beach, Florida 33069 <br />Phone: (954) 831 -0747 <br />Fax: (954) 831 -0798 <br />Email: agarcia @broward.orE <br />OYER <br />Mr. Peter Moore, P.E., Principal Engineer <br />Chen and Associates, Inc. <br />500 W. Cypress Creek Road. Suite 410 <br />Fort Lauderdale, Florida 33309 <br />Email: pmmoore @chenandassociates.com <br />",?Q <br />---------------------------- <br />July 2007 / January 2008 & Updated in 2009 <br />CRAVEN THOMPSON & <br />Contract Amount: $97.200.00 <br />Billed: $97,200.00 <br />Project consisted of surveying the full right -of -way of State Road 7 for <br />approximately 2 miles to design a proposed 20 inch water main location. <br />Due to the amount of traffic and danger to staff, we utilized a Leica 3D <br />Laser scanner to perform a High Definition Survey of the roadway in 3 <br />dimensions. We were able to capture sufficient details, both horizontal <br />and vertical to complete the survey. <br />2 1 Page 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.