My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:53:10 AM
Creation date
8/26/2014 10:37:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0) <br />W <br />C�: <br />W <br />0 <br />MARINE PROJECTS <br />PROJECT <br />High Speed Ferry Terminal Pier <br />Key West, Florida <br />Speed Ferry Terminal Seawall <br />Fort Myers, Florida <br />Channel Mark Restaurant <br />Fort Myers Beach, Florida <br />Snug Harbor Docking Pier <br />Fort Myers Beach, Florida <br />gaming boat <br />North Fort Myers Fishing Pier <br />Englewood Beach Fishing pier <br />Charlotte County <br />Moore Haven City Pier Replacement <br />REQUEST FOR QUALIFICATIONS NO. 14 -07 -02 <br />DESCRIPTION <br />Prestressed concrete deck pier on reinforced <br />concrete on reinforced concrete pile caps and <br />prestressed concrete piling <br />Coated heavy steel sheet pile cantilever <br />seawall for 10' water depth <br />Seawall and shoreline replacement for boat <br />accessible restaurant <br />Reinforced concrete /timber marginal dock <br />with bollards and Tendering for mooring large <br />Prestressed concrete pier with canopy <br />Timber fishing pier structure <br />Replacement of timber city dock on the <br />Okeechobee Waterway <br />Fort Myers Beach Fishing Pier Repairs Extensive concrete repairs to main beach <br />Fort Myers Beach, Florida fishing substructure and replacement of <br />reinforced concrete deck slabs with timber <br />concession building and shade structure <br />Hickey Creek Mitigation Park <br />Oyster Creek & Amberjack Creek Parks <br />Charlotte County, Florida <br />Sea Ranch of Boca Marina <br />Bridges, Docks, Seawalls <br />Boca Raton, Florida <br />Seawall — A -Dock <br />South Seas Plantation <br />Captiva Island, Florida <br />Crown Bay Cruise Ship Marina <br />St. Thomas, U.S. Virgin Islands <br />Cruise Ship Pier <br />St. Johns, Antigua <br />Whitaker Bayou <br />Sarasota, Florida <br />Fort Pierce Port Expansion <br />Timber fishing piers and boardwalks <br />Timber fishing piers and boardwalks <br />Sanibel Harbour Fishing Pier <br />Punta Rassa, Florida <br />Pelican Isles Marina <br />Boat Basin Fixed Piers <br />Naples, Florida <br />Hicky Creek Mitigation Park <br />Fishing Piers, Boardwalk, Walkovers <br />Lee County, Florida <br />North Fort Myers Pier <br />on the Caloosahatchee River <br />Lee County, Florida <br />Fort Myers Beach Fishing Pier Repairs <br />Fort Myers Beach, Florida <br />Fort Pierce, Florida Buquebus Terminal Pier <br />Charlotte Harbour Yacht Club Expansion Key West, Florida <br />7 R C Charlotte Harbor, Florida <br />WORLDWIDE ENGINEERING <br />2 1 Page 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.