Laserfiche WebLink
Car <br />MatthewCigale, P.E. <br />,� . „_... , _ .. u........o <br />REQUEST FOR QUALIFICATIONS NO. 14 -07 -02 <br />entire 650 acres. The sanitary sewer collection system consisted of 22.047 L.F. - 8" gravity main. and 34 L.F. <br />- 10" gravity main. The sanitary force main system consisted of 295 L.F. - 8" main. 2.235 L.F. - 10" main, <br />3.790 L.F. 12" main, 4,300 L.F. - 16" main, and 4.205 L.F. - 20" main. There were ninety three (93) new <br />sanitary manholes added to the area. The water distribution system additions included 5.760 L.F. - 16 "water <br />main. 7.156 L.F. - 12" water main. 1.256 L.F. - 10" water main. 12.779 L.F. - 8" water main and 44.217 L.F. - <br />6" water main. <br />District 3A Wastewater system Modeling and Force Main Improvements I Broward County Water and <br />Wastewater Services I Project Engineer- Construction Budget: $1.8 Million BCWWS upgraded and relocated <br />the wastewater Master Pump Station 310 serving Fort Lauderdale /Hollywood International Airport to <br />accommodate the increased sanitary flows from the airport expansion and redevelopment of the area. Mr. <br />Cigale assisted in modeling the entire District 3A wastewater system involving 38 lift stations and associated <br />force main network and designed and permitted approximately 7.000 sf. of 16 -inch main along Ravenswood <br />Road. <br />Coconut Creek Community Center I City of Coconut Creek I Project Engineer <br />Construction Cost: $5,300,000.00. The Master Plan included sports courts. amphitheater. play areas. <br />boardwalks & jogging paths. Site is extensively landscaped with buffer planting & berming on all sides. Design <br />includes 2 interpretive areas with butterfly gardens. This state -of- Community Center facility replaces an <br />outgrown and outdated facility on the same site. <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53rd STREET. FORT LAUDERDALE. FL 33309 1 P 954.739.6400 <br />3 1 Page 20 <br />