Laserfiche WebLink
• <br />• <br />A <br />• <br />• <br />A <br />• <br />• <br />A <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />A <br />• <br />A <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />A <br />• <br />• <br />• <br />• <br />A <br />• <br />• <br />• <br />a <br />ar9�•na�eoie.®oa.� c <br />Matthew Cigale, P.E. <br />REQUEST FOR QUALIFICATIONS NO. 14 -07 -02 <br />Mr. Cigale's extensive knowledge includes site plan layout, roadway design. water <br />distribution system design, wastewater collection & transmission system design, <br />storm water management design. planning and calculations, project management. <br />cost estimation, construction permitting. and construction management. <br />CRAVEN THOMPSON & ASSOCIATES, INC.. Fort Lauderdale. Florida'Y� '-"'F ' <br />November 1999 to Present I Civil Engineer <br />PARAMOUNT ENGINEERING GROUP, INC.. Boca Raton. Florida <br />October 1997 to November 1999 1 Project Manager <br />Garden Acres Neighborhood Improvements I City of Oakland Park I Project Engineer - Mr. Cigale was <br />responsible for permitting and Construction Management for residential infrastructure improvement(s) <br />rehabilitation within the City of Oakland Park. Services include: water distribution system design: wastewater <br />collection & transmission systems design: roadway design: storm water design: permitting: bidding assistance <br />and construction administration. The water improvements consisted of 5.591 linear feet of 6" diameter main, <br />and 962 linear feet of 8" diameter main. <br />North Central County Neighborhood Improvements Project I Broward County Water and Wastewater Services <br />Project Engineer - Assisted in storm water modeling. design and permitting of water distribution system, <br />wastewater collection & transmission system: roadway: permitting; bidding assistance and construction <br />administration. This consisted of approximately 21 miles of roadway. 28.359 linear feet of sanitary lines. <br />21.308 linear feet of water main, and 17.5 miles of walk. <br />North County Neighborhood Improvements Project, (NE) Northeast Quadrant, Broward County I Broward <br />County Water and Wastewater Services I Project Engineer - He assisted in design and permitting of water <br />distribution and sanitary sewer for rehabilitation project. This included a sanitary sewer collection system <br />consisting of 69.550 L.F. - 8" gravity main. 807 L.F. - 10" gravity main. 129 L.F. - 12" gravity main. and 144 <br />L.F. - 16" gravity main. The sanitary force main system consisted of 540 L.F. - 8" main, and 1.540 L.F. 12" <br />main. The water distribution system additions included 35.626 L.F. - 6" main. 10.161 L.F. - 8" main. 841 L.F. <br />- 12" main. 1.306 L.F. - 20" main, and 1.023 L.F. - 24" main, totaling 9.27 miles of water main. <br />North County Neighborhood Improvement Project, (NW) Northwest Quadrant I Broward County. Florida <br />Project Engineer - The North County Neighborhood Improvement Project (NCNIP) Northwest Quadrant (NW <br />includes approximately 650 acres of land between Dixie Highway and 1 -95. North of Sample Road, in the City <br />of Deerfield Beach. Mr. Cigale worked on the storm water modeling, design and permitting for the water <br />distribution. sanitary sewer collection systems. storm sewer systems, and roadway improvements for the <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53,-STREET, FORT LAUDERDALE. FL 33309 1 P 954.739.6400 <br />3 1 Page 19 <br />Civil Engineer I Senior Engineer <br />i r <br />Bachelor of Science in Civil Engineering <br />Clarkson University I Potsdam. New York 1 1996 <br />Professional Engineer - Florida No. 74584 - 2012 <br />• r a• a• a <br />14 Years w /CT.A. 2 Years w /Other Firms <br />Mr. Cigale's extensive knowledge includes site plan layout, roadway design. water <br />distribution system design, wastewater collection & transmission system design, <br />storm water management design. planning and calculations, project management. <br />cost estimation, construction permitting. and construction management. <br />CRAVEN THOMPSON & ASSOCIATES, INC.. Fort Lauderdale. Florida'Y� '-"'F ' <br />November 1999 to Present I Civil Engineer <br />PARAMOUNT ENGINEERING GROUP, INC.. Boca Raton. Florida <br />October 1997 to November 1999 1 Project Manager <br />Garden Acres Neighborhood Improvements I City of Oakland Park I Project Engineer - Mr. Cigale was <br />responsible for permitting and Construction Management for residential infrastructure improvement(s) <br />rehabilitation within the City of Oakland Park. Services include: water distribution system design: wastewater <br />collection & transmission systems design: roadway design: storm water design: permitting: bidding assistance <br />and construction administration. The water improvements consisted of 5.591 linear feet of 6" diameter main, <br />and 962 linear feet of 8" diameter main. <br />North Central County Neighborhood Improvements Project I Broward County Water and Wastewater Services <br />Project Engineer - Assisted in storm water modeling. design and permitting of water distribution system, <br />wastewater collection & transmission system: roadway: permitting; bidding assistance and construction <br />administration. This consisted of approximately 21 miles of roadway. 28.359 linear feet of sanitary lines. <br />21.308 linear feet of water main, and 17.5 miles of walk. <br />North County Neighborhood Improvements Project, (NE) Northeast Quadrant, Broward County I Broward <br />County Water and Wastewater Services I Project Engineer - He assisted in design and permitting of water <br />distribution and sanitary sewer for rehabilitation project. This included a sanitary sewer collection system <br />consisting of 69.550 L.F. - 8" gravity main. 807 L.F. - 10" gravity main. 129 L.F. - 12" gravity main. and 144 <br />L.F. - 16" gravity main. The sanitary force main system consisted of 540 L.F. - 8" main, and 1.540 L.F. 12" <br />main. The water distribution system additions included 35.626 L.F. - 6" main. 10.161 L.F. - 8" main. 841 L.F. <br />- 12" main. 1.306 L.F. - 20" main, and 1.023 L.F. - 24" main, totaling 9.27 miles of water main. <br />North County Neighborhood Improvement Project, (NW) Northwest Quadrant I Broward County. Florida <br />Project Engineer - The North County Neighborhood Improvement Project (NCNIP) Northwest Quadrant (NW <br />includes approximately 650 acres of land between Dixie Highway and 1 -95. North of Sample Road, in the City <br />of Deerfield Beach. Mr. Cigale worked on the storm water modeling, design and permitting for the water <br />distribution. sanitary sewer collection systems. storm sewer systems, and roadway improvements for the <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53,-STREET, FORT LAUDERDALE. FL 33309 1 P 954.739.6400 <br />3 1 Page 19 <br />