My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Comtech - ITB 23-05-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
Responses
>
Comtech - ITB 23-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 11:28:53 AM
Creation date
6/29/2023 11:27:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMTECH <br />engineering , inc. <br />Section 3 —Staffing <br />Comtech's key personnel on this project include Jose Sierra, President and Senior Project <br />Manager, and Elizabeth Page, Project Manager. Resumes for Comtech's key personnel are <br />included herein. <br />Comtech's major subcontractors and suppliers are listed below: <br />• Electrical Subcontractor: Advance Electric, Inc. <br />o 130205W 128 Street, Miami, Florida 33186 <br />• Instrumentation Subcontractor: CC Control Corp <br />o 5760 Corporate Way, West Palm Beach, Florida 33407 <br />• HVAC Subcontractor: Air at Your Door <br />o 14262 SW 140 Street, Suite 103, Miami, Florida 33186 <br />• Pump Manufacturer: Morrison Pump Company <br />o 2514 Hollywood Boulevard, Hollywood, Florida 33020 <br />TTiS 23- as 6 2 t� <br />
The URL can be used to link to this page
Your browser does not support the video tag.