My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Comtech - ITB 23-05-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
Responses
>
Comtech - ITB 23-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 11:28:53 AM
Creation date
6/29/2023 11:27:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESUME <br />Jose Sierra, CGC,CUC <br />President <br />Mr. Sierra has over 30 years of experience in the water and wastewater <br />industry. Before founding Comtech Engineering, Inc. over 23 years ago, Mr. <br />Sierra worked as a construction manager for the Miami -Dade Water and <br />Sewer Department. <br />Professional Registrations <br />Mr. Sierra has vast experience in all facets of water and wastewater facility <br />• CGC - FL <br />construction. He has overseen the construction of numerous water and <br />• CUC—FL <br />wastewater facility projects throughout South Florida. He is responsible for <br />• General Engineering Contractor <br />coordination of all subcontractors and suppliers, coordination between the <br />License <br />engineer and owner, enforcement of safety protocols and overall project <br />execution. <br />Education + Training <br />Water and Wastewater Facility Construction <br />• B.S., Construction <br />Management, Florida <br />Miami -Dade Water and Sewer Department, South District Wastewater <br />international University <br />Treatment Plant (SDWWTP) Onsite Sodium Hypochlorite Generation (OSHG) <br />• OSHA <br />Sodium Hypochlorite Tank No. 2 Repairs <br />Structural rehabilitation to the existing Sodium Hypochlorite Tank No. 2 <br />Affiliations + Memberships <br />repairs, including installation of a new liner and associated mechanical pipe <br />• FSAWWA <br />and electrical relocation work. <br />Miccosukee Tribe of Indians of Florida, Water Treatment Plant Upgrades, <br />Languages Spoken Miami, FL <br />• English Construction of upgrades to the existing water treatment plant, including <br />• Spanish installation of a pellet softening system, gravity filter system and backwash <br />pump system, low lift pump system, caustic and carbon dioxide systems and <br />chemical injection and mixing systems. <br />Water and Wastewater Pump Station and Pipeline Construction <br />Miami -Dade Water & Sewer Department, Pump Station 698, Miami, FL <br />Construction of a new triplex sanitary sewer pumping station, 24 -inch gravity <br />sewer and 24 -inch force main. <br />Miami -Dade Water & Sewer Department, Pump Station 414, Miami, FL <br />Rehabilitation of Master Pump Station 414. <br />Miami -Dade Water & Sewer Department, Pump Station 416, Miami, FL <br />Rehabilitation of Master Pump Station 416. <br />Miami -Dade Water & Sewer Department, Pump Station 417, Miami, FL <br />Rehabilitation of Master Pump Station 417. <br />COMTECH <br />engineering , inc. <br />STP 25- 05- OZ i5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.