My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Comtech - ITB 23-05-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
Responses
>
Comtech - ITB 23-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 11:28:53 AM
Creation date
6/29/2023 11:27:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESUME <br />Jose Sierra, CGC,CUC <br />President / Project Manager <br />Miami -Dade Water and Sewer Department, Perrine/Cutler Ridge Area, Basin C Water and Sewer Piping and Pump <br />Station Improvements, Miami, FL <br />Construction of a new triplex sanitary sewer pumping station, water main, force main and gravity sewer main. <br />Pumping station included a new generator. <br />City of Coral Gables, Sanitary Pump Station Cocoplum #3 Rehabilitation Project, Coral Gables, FL <br />Rehabilitation of an existing duplex sanitary sewer pumping station and installation of a new force main. <br />City of Coral Gables, Sanitary Sewer Pump Station Journey's End Rehabilitation Project, Coral Gables, FL <br />Rehabilitation of an existing duplex sanitary sewer pumping station and installation of a new force main. <br />Florida International University (FIU), FIU Biscayne Bay Campus Lift Station Upgrade, Miami, FL <br />Construction of a new triplex sanitary sewer pumping system with a generator. Project includes demolition of the <br />existing pumping station nearby. <br />Broward County Water and Wastewater Services, Generic Short Line Extensions and Relocations (2020 — ongoing), <br />Broward County, FL <br />Installation of various water and wastewater underground infrastructure throughout Broward County. Work <br />completed to date under this contract includes installation of new force mains, gravity mains, water mains and <br />associated infrastructure. <br />All projects listed above are from the last five years. Additional information can be provided upon request. <br />COMTECH <br />engineering , Inc. <br />t'i <br />
The URL can be used to link to this page
Your browser does not support the video tag.