My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Comtech - ITB 23-05-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
Responses
>
Comtech - ITB 23-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 11:28:53 AM
Creation date
6/29/2023 11:27:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional Registrations <br />• PE - FL <br />• ENVSP <br />Education + Training <br />• M.E., Environmental <br />Engineering, University of Florida <br />• B.S., Civil Engineering, University <br />of Florida <br />• OSHA <br />Affiliations + Memberships <br />• Chair, FSAW WA Region VII <br />• Past Quality Control Officer for <br />the Coral Gables Office (Hazen <br />and Sawyer)" <br />Languages Spoken <br />• English <br />• Spanish <br />ITO 2�)- b5--02 <br />RESUME <br />Elizabeth Page, P.E. <br />Project Manager <br />Ms. Page has over 9 years of experience in the water and wastewater <br />industry. Her responsibilities as a Project Manager at Comtech Engineering, <br />Inc. include but are not limited to project management and coordination, <br />permitting, construction submittals, scheduling, billing, quality control and <br />overall coordination between the owner and engineer. <br />Prior to working at Comtech Engineering, Inc., Mrs. Page was responsible for <br />the design and construction of multiple water and wastewater infrastructure <br />projects, including wastewater treatment facility upgrades, wastewater <br />pumping stations and pipelines. <br />Water and Wastewater Facility Construction <br />Miami -Dade Water and Sewer Department, South District Wastewater <br />Treatment Plant (SDWWTP) Onsite Sodium Hypochlorite Generation <br />(OSHG) Sodium Hypochlorite Tank No. 2 Repairs <br />Structural rehabilitation to the existing Sodium Hypochlorite Tank No. 2 <br />repairs, including installation of a new liner and associated mechanical pipe <br />and electrical relocation work. <br />Miccosukee Tribe of Indians of Florida, Water Treatment Plant Upgrades, <br />Miami, FL <br />Construction of upgrades to the existing water treatment plant, including <br />installation of a pellet softening system, gravity filter system and backwash <br />pump system, low lift pump system, caustic and carbon dioxide systems and <br />chemical injection and mixing systems. <br />*Broward County Water & Wastewater Services, North Regional <br />Wastewater Treatment Plant (NRWWTP) Solids, Pompano Beach, FL <br />Design and construction of upgrades to Broward County's NRWWTP solids <br />handling equipment and facilities, including civil, mechanical and electrical <br />upgrades to multiple anaerobic digesters, dewatering centrifuges and belt <br />presses and the existing DAFT thickening system. <br />*Broward County Water & Wastewater Services, NRWWTP Fast Track, <br />Pompano Beach, Florida <br />Design and construction of upgrades to Broward County's NRWVJTP, <br />including installation of new influent piping, grit chambers, boilers and heat <br />exchangers. <br />)1 <br />COMTECH <br />engineering , inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.