My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3515
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2023 11:50:33 AM
Creation date
7/21/2023 4:46:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3515
Date (mm/dd/yyyy)
06/15/2023
Description
RFP 23-04-02 Agreement w/ Disaster Program & Operations, Inc. for disaster debris monitoring services.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To ensure that processing of federal funding is acquired as quickly as possible by verifying the following <br />information and its accuracy responsibilities: <br />• Review/reconciliation of debris Contractor invoices and payment recommendation letter <br />• Monitoring and Collection information (reports, logs, etc.) <br />• Project Status Reports <br />• Completed Load tickets <br />• Photographs of Debris Collections <br />• Tipping Fee Receipts <br />• Contractor invoices <br />• Review of debris Contractor equipment hours of operation <br />• Vehicle certifications <br />• Start and end dates and progress mapping of the first debris removal pass and all subsequent passes <br />• Daily logs and TRKRTM Detail mapping to support Emergency Road Clearing services. <br />Stress on Quick Closeout of Projects. Many PWs particularly involving Category and B activities can often be <br />moved to closeout quickly. Werecommend all projects be moved to closeout as expeditiously as possible. Developing <br />the closeout files is most effective when everyone's memory is clear, and staff involved in the activities are still <br />accessible. <br />Client Staff Involvement/Cross Training. We understand that the City may want or need to end support activities <br />prior to the extended closeout process that sometimes can occur at the FEMA level. Thus, integrating the City staff <br />into the long-term recovery and closeout phase will be essential to DP&O. <br />All client disaster Data is Stored in DP&O's Disaster Claims Management System for long term document <br />storage and to facilitate project close out and future audits. <br />For all DP&O clients we maintain a PW template excel summary per each Final PW with support tabs for <br />Contractor Summary, Force labor, Staff inventory, Force Equipment, Equipment Inventory and Materials <br />if used. The PW Summary sheet for each project provides quantities, costs, for Contractors, Force labor, <br />Equipment, and Materials and line items for FEMA and State Share. <br />DP&O maintains a tracking system that documents the Date of PW FEMA PA Portal applicant submittal, and <br />FEMA acceptance. The PW is then tracked through CRC approval to FEMA EMMIE obligation. <br />Each PW per FEMA Category is maintained both electronically, and manually in audit proof format to <br />facilitate a quick project close out and or audit. All projects' financial supporting documents are 100% accurate <br />and audit ready. <br />Funding Support <br />DP&O shall be prepared to submit FHWA reimbursement claim as needed. DP&O' shall be prepared to assist <br />tracking progress of project worksheets and provide quick response to any. issue that could slow funding. DP&O <br />shall assist client in finding additional funding sources related to mitigation. <br />The Team will ensure that all management, and administration of disaster recovery projects, and associated <br />disaster reimbursement costs claims, and documents comply with FEMA's most recent Program Policy guide, <br />2CFR200 for procurement and contracting, and OMB Cost Circulars A-133 Audits and Office of Inspector audit <br />tips. In addition, all state and federal environmental policies for permitting and reporting will be adhered to. <br />67 <br />,aA <br />
The URL can be used to link to this page
Your browser does not support the video tag.