My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3523
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 10:06:09 AM
Creation date
8/16/2023 10:04:14 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3523
Date (mm/dd/yyyy)
07/20/2023
Description
3rd Amendment w/ Craig A. Smith & Associaties for Civil Engineering Svcs for Central Island Area Pump Stations & Drainage Improvements.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Services Proposal Page 1 <br />Sunny Isles Central Island Area Pump Stations <br />Sunny Isles Beach, Miami -Dade County, Florida <br />SCHEDULE/DELIVERABLES <br />Upon receiving written authorization to proceed, we will commence with field marking of <br />the boring locations and preparation of the utility locate request. Mobilization for the <br />drilling operations will occur soon after Sunshine 811 clearance of boring locations is <br />received from the contacted utilities.. These two upfront activities are expected to require <br />no more than 2 to 3 weeks to complete. <br />The specified field drilling work is expected to require 1 day to complete. Laboratory visual <br />classification of the soils and report preparation will require about 2 to 3 weeks to complete <br />following completion of field work. We expect to provide the final report signed and sealed <br />by a registered professional engineer within 4 to 6 weeks of notice to proceed; however, <br />accelerations of this schedule may be facilitated if needed. <br />COMPENSATION & TERMS <br />Based upon our understanding of the project and interpretation of your requirements, we <br />propose to perform the scope of work outlined previously for a Lump Sum Fee as detailed <br />in the Fee Breakdown on Attachment A. <br />Soil samples obtained from the drilling operations will be retained by RADISE for a period <br />of 90 days from the date of drilling and then they will be discarded unless alternate terms <br />are agreed to in writing with the client. <br />CLOSURE <br />RADISE appreciates the opportunity to provide our services for this project, and trust that <br />the scope of work and fee presented in this proposal are clear and understandable. <br />Should the proposal contents require any clarification or amplification, please feel free to <br />contact us. <br />Sincerely, <br />RADISE International, L.C. <br />Andrew Nixon, P.E. <br />Operations Manager <br />Attachments: A — Fee Breakdown <br />RADISE <br />IN TR R NAT I ON AL <br />
The URL can be used to link to this page
Your browser does not support the video tag.