Laserfiche WebLink
E <br />RADIC-S <br />INTERNATIONAL <br />1.0 FIELD EXPLORATION <br />1.1 Stake borings and Utility Cleara <br />1.2 Mobilize Equipment - Drill Rig <br />1.3 SPT Borings (2 to 30') <br />1.3.1 SPT Boring -0' to 50' <br />1.3.2 Casing Allowance - 0' t0 <br />soil conditions <br />1.3.3 Grout Seal/Cold Patch <br />Attachment A - Fee Breakdown <br />Geotechnical Engineering Services <br />Sunny Isles Central Island Area Pump Stations <br />Sunny Isles, Miami -Dade County, Florida <br />Qty <br />nce (Staff Engineer) 8 <br />Truck) 2 <br />60 <br />50'- To keep borehole open in caving 60 <br />Boreholes 60 <br />2.0 LABORATORY SERVICES <br />2.1 Laboratory Visual Classification QCNerification- (Staff Engineer) <br />2.2 Natural Moisture Test (2 per boring) <br />2.3 Full Grain Size Analysis (1 per boring) <br />2.4 Fine Content Test (2 per boring) <br />2.5 Organic Content Test (1 per boring) <br />3.0 PROFESSIONAL ENGINEERING AND REPORTING SERVICES <br />3.1 Principal Engineer - QC Review <br />3.2 Senior Engineer <br />3.3 Project Engineer <br />3.4 Drafter/ CADD <br />Unit Unit Price Total <br />Hour <br />$ <br />105.00 <br />$ 840.00 <br />Each <br />$ <br />350.00 <br />$ 700.00 <br />Foot <br />$ <br />16.00 <br />$ 960.00 <br />Foot <br />$ <br />7.00 <br />$ 420.00 <br />Foot <br />$ <br />6.00 <br />$ 360.00 <br />TOTAL <br />FIELD <br />WORK <br />$ 3,280.00 <br />2 <br />Hour <br />$ <br />105.00 <br />$ 210.00 <br />4 <br />Each <br />$ <br />15.00 <br />$ 60.00 <br />2 <br />Each <br />$ <br />85.00 <br />$ 170.00 <br />4 <br />Each <br />$ <br />50.00 <br />$ 200.00 <br />2 <br />Each <br />$ <br />50.00 <br />$ 100.00 <br />TOTAL LABORATORY SERVICES <br />$ 740.00 <br />2 <br />Hour $ 185.00 <br />$ <br />370.00 <br />8 <br />Hour $ 155.00 <br />$ <br />1,240.00 <br />24 <br />Hour $ 125.00 <br />$ <br />3,000.00 <br />12 <br />Hour $ 65.00 <br />$ <br />780.00 <br />TOTAL PROFESSIONAL SERVICES <br />$ <br />5,390.00 <br />TOTAL AMOUNT <br />$ <br />9,410.00 <br />